Dormakaba 1816 HJ Installation Instructions Manual
Dormakaba 1816 HJ Installation Instructions Manual

Dormakaba 1816 HJ Installation Instructions Manual

Surface applied door closer

Advertisement

Quick Links

1816 HJ & SFJ
Surface applied door closer
HJ (stnd jamb mount) x drop plate
SFJ (swing free jamb mount) x drop plate
Installation instructions
08280201 – 03-2020
| EN |

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the 1816 HJ and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Summary of Contents for Dormakaba 1816 HJ

  • Page 1 1816 HJ & SFJ Surface applied door closer HJ (stnd jamb mount) x drop plate SFJ (swing free jamb mount) x drop plate Installation instructions 08280201 – 03-2020 | EN |...
  • Page 2: Table Of Contents

    1816 HJ & SFJ Installation Instructions Table of Contents Table of contents 1  Technical specifications Overview Tools recommended Installation instructions Overall Install main arm Install closer (top jamb mount) Install closer (top jamb mount x drop plate) Preload main arm...
  • Page 3: Technical Specifications

    1816 HJ & SFJ Installation Instructions Technical specifications 1  Technical specifications Overview Each 1816 HJ & SFJ unit contains a door closer, Please make sure you have the tools listed plus hold open solenoid. make sure you have the correct model unit and hand designation per your application.
  • Page 4: Installation Instructions

    1816 HJ & SFJ Installation Instructions Closer overall Installation instructions 2.1 Overall Fig.1 Left hand installation Right hand installation Part Cover Cover screws Main arm Connecting arm Rod and shoe 1816 unit (HJ or FSFJ - LH/RH) Combo screws...
  • Page 5: Install Main Arm

    1816 HJ & SFJ Installation Instructions Main arm 2.2 Install main arm Fig.2 Remove the cover (1) by unscrewing the 2.2.2 Pry apart connecting arm (4) 2.2.1 Remove the cover (1) by unscrewing the two Phillips two Phillips screws (2).
  • Page 6: Install Closer (Top Jamb Mount)

    1816 HJ & SFJ Installation Instructions Install closer 2.3 Install closer (top jamb mount) Fig.3 Left hand Right hand • Standard closing power foot orientation shown. • For 15% more closing power invert the shoe 180°. Left hand Right hand 2.3.1 Prepare door and frame using the template...
  • Page 7: Preload Main Arm

    1816 HJ & SFJ Installation Instructions 2.5 Preload main arm Fig.5 Left hand Right hand 2.3.1 Preload main arm (3) by rotating approximately 10° and press rivet head into the retaining pocket on the connecting arm (4). NOTE: View shown looking upwards.
  • Page 8: Adjustments

    1816 HJ & SFJ Installation Instructions Adjustments: closing speeds Adjustments: hold open Adjustments Check closing sweep (S) and latch (L) speed; adjust Be sure closer has appropriate spring as necessary. power prior to making any closer speed Backcheck position will advance approximately 15 adjustments.
  • Page 9: Wiring

    1816 HJ & SFJ Installation Instructions Wiring Wiring 4.1 Electrical connections Fig.8 Verify voltage marked on unit identification label and connect the two incoming power wires to terminal block. Power input see electrical specs * (24V or yellow wires from transformer).
  • Page 10: On/Off Switch (Optional)

    1816 HJ & SFJ Installation Instructions Wiring Testing Covers 4.4 ON/OFF switch (optional) Fig.11 Wire ON/OFF switch as shown above. Push button will cut power to the hold open ON/OFF INPUT solenoid and the door will close. SOLENOID SWITCH...
  • Page 11 DORMA USA, Inc. 1 Dorma Drive, Drawer AC Reamstown, PA 17567 T: 717-336-3881 F: 717-336-2106 www.dormakaba.com...

This manual is also suitable for:

1816 sfj

Table of Contents