Download Print this page

Source SEM-SM BH P04 Installation Instructions

Small emergency bulkhead

Advertisement

Quick Links

DISASSEMBLY INSTRUCTIONS
Product end of life instruction.
This Lighting product is in the scope of EU 2019/2020 directive on Waste Electrical and Electronic Equipment
(WEEE). This product must be disposed of, according to the legislation. This document is intended for use by
end of life recyclers or treatment facilities. It provides the basic information to assure an appropriate end of life
treatment for the components and materials of the product.
Please follow pictured diagram on the back of this manual showing how to dismantle the product into different
components which should be disposed of correctly. These components consist of plastic, metal and electronic
materials.
It is the responsibility of the end user to dispose of this product correctly. Contact www.weeeireland.ie or your
local council for further information.
Disassembly Diagram
Unit 7/8 Ashbourne Business Centre, Ballybin Road, Ashbourne, Co. Meath, Ireland, A84 YP58,
For more information contact:
Phone:
00353 1 835 7447
Unit 32 Junction One Business Park, Valley Road, Birkenhead, Merseyside, UK, CH41 7ED,
UK Ph:
0330 551 7000
www.sgd.ie
Website:
Legend
Screw
Diffuser
LED Luminaire
Plastic Plate
Driver
Hook
Battery
Waterproof Strip
Plastic Base
Nut
IP65
COMPLIANT
Installation Instructions
years
Quality
SMALL EMERGENCY BULKHEAD
Assurance
PRODUCT CODE: SEM-SM BH P04
EMERGENCY BULKHEAD INSTRUCTIONS
SAFETY This is a mains powered product. It must be installed by a
qualified electrician and in accordance with applicable building and
SAFETY This is a mains powered product. It is designed to be installed by a qualified electrician and in accordance with the
electrical regulations. Before installation or maintenance, the electrical
applicable building and electrical regulations. Before installation or maintenance the electrical supply to the product must be
supply to the product must be isolated.
isolated.
WARRANTY This product is warranted to be free of defects in materials, design and workmanship for 5 years from the date of
WARRANTY This product has a 5 year warranty. This warranty does not
purchase. This warranty does not include batteries or consumable items such as fuses. The NiCd Battery has a 2 year warranty.
include batteries or fuses. There is a 3 year warranty for the LiFe P04.
The LiFeP04 has a 3 year warranty.
LUMINAIRE INSTALLATION
LUMINAIRE INSTALLATION
1. Remove diffuser by unscrewing the two screws
1.
Remove diffuser by unscrewing the two screws.
2. Screw the base to the chosen mounting surface using the 4 screw
2.
Hinge the gear tray open by pushing apart the two retaining clips.
3.
Screw fix the base to the chosen mounting surface using the two screw
fixing points in the base. These should be drilled to a size to suit
fixing points in the base moulding at 240mm centres. These should be
the fixing screws. Note: It is the responsibility of the installer
drilled to a size to suit the fixing screws.
to ensure that these fixing points are sealed to ensure that IP65
Note: It is responsibility of the installer to ensure these fixing points
rating is maintained. The use of a silicone sealant is
are sealed to ensure the IP65 rating is maintained. The use of a
silicone sealant is recommended.
recommended.
4.
Select one of the available cable entry points on the base (one on either
3. Select one of the available cable entry points on the base (one on
end, on one side, or through the bottom) & drill to suitable size to suit IP65
either end and drill to suitable size to suit IP65 rated (or better) cable
rated (or better) cable entry gland (not provided).
entry gland (not provided).
5.
Install cable entry gland.
6.
Depending on which variant of the product you have, determine your
4. Install cable entry gland.
required function & route the appropriate power supply cable to the terminal
5. Depending on which variant of the product you have, determine your
block & terminate as shown.
required function and route the appropriate power supply cable to the
terminal block and terminate as shown.
FOR MAINTAINED OPERATION
FOR MAINTAINED OPERATION
(NON-SWITCHABLE)
BLUE
BROWN
GREEN & YELLOW
Keep Link Wire
7.
If applicable, tighten cable gland to seal & secure mains cable.
6. If applicable, tighten cable gland to seal and secure mains cable.
8.
Connect the battery pack to the PCB by connecting the female socket on the battery wires to the male plug mounted on
7. Connect the battery pack to the PCB by connecting the female socket on the battery wires to the male plug
the PCB, ensuring the correct orientation.
9.
Enter the "Installation Date" in the appropriate place on the battery pack label.
mounted on the PCB, ensuring the correct orientation.
10. Hinge the gear tray closed & snap fit of clips to secure.
8. Enter the 'Installation Date' in the appropriate place on the battery pack label.
11. Refit the diffuser & secure using the two screws.
9. Refit the diffuser and secure using the two screws.
12. Reconnect the power supply & check the green LED charge indicator illuminates.
10. Reconnect the power supply and check the green LED charge indicator illuminates.
13. The batteries should be allowed to charge for at least 24 hours before carrying out a full discharge test to check they are
charging correctly & the maintained duration is being achieved.
11. The batteries should be allowed to charge for at least 24 hours before carrying out a full discharge test to
check they are charging correctly and the maintained duration is being achieved.
OPERATION / MAINTENANCE
1.
NiCd battery life is 2 years, after which time it should be replaced with a suitable equivalent. TheP04LiFe battery
OPERATION / MAINTENANCE
should be changed after 3 years.
2.
This luminaire MUST be disconnected before it is subjected to any high voltage or insulation resistance testing,
1. P04 LIFE batteries should be changed after 2 years.
otherwise irreparable damage will occur to luminaire components.
2. This luminaire MUST be disconnected before it is subjected to any high voltage or insulation resistance
3.
Ensure cleanliness of luminaires is maintained so as not to affect performance.
testing.
RECESSED MOUNT KIT INSTALLATION –
3. Ensure cleanliness of luminaire is maintained so as not to affect performance.
1.
Prepare ceiling by cutting suitable size aperture. We recommend 360mm x 110mm.
2.
Bend springs up to vertical & push the back of the frame up through aperture, then allow the springs to snap back
against the top of the ceiling to retain.
3.
Drill out the two fixing points at 240mm centres in the base of the luminaire & then secure the base to the frame using 2-
off M4 screws aligned with the tapped holes on the brackets of the frame.
4.
Other installation details as per LUMINAIRE INSTALLATION section above.
FOR NON-MAINTAINED OPERATION
(SWITCHABLE)
BLUE
BLUE
BROWN
BROWN
BROWN
GREEN & YELLOW
GREEN & YELLOW
Remove Link Wire
Remove Link Wire

Advertisement

loading
Need help?

Need help?

Do you have a question about the SEM-SM BH P04 and is the answer not in the manual?

Questions and answers

Summary of Contents for Source SEM-SM BH P04

  • Page 1 Assurance Product end of life instruction. PRODUCT CODE: SEM-SM BH P04 This Lighting product is in the scope of EU 2019/2020 directive on Waste Electrical and Electronic Equipment (WEEE). This product must be disposed of, according to the legislation. This document is intended for use by end of life recyclers or treatment facilities.
  • Page 2 This should be done for the full 3 hour duration Do this for a period of time sufficient to check that the light source illuminates from the battery supply. •...
  • Page 3 Declaration Number: 099-SEM SM BH PO4 This declaration of conformity is issued under the sole responsibility of the manufacturer. Products: Mini Emergency Bulkhead 6500K IP65, 2W 3.6V LiFe PO4 3.2V 1000mAh Maintained/NM Model Number: SEM SM BH PO4 The product/model of the declaration described above is in conformity with the relevant Community harmonisation legislation: Low Voltage Directive (2014/35/EU) EMC (2014/30/EU)