NPK standard to alert the reader to situations which, if not avoided, could result in equipment damage. WARNING and BASIC OPERATING INSTRUCTIONS decals are included with each NPK hammer and installation kit. Decals must be installed in the cab, visible to the operator while operating the hammer. STAY...
Page 3
9. Match HAMMER size to carrier according to NPK recommendations. The carrier must be stable during hammer operation and during transport. 10. Do not make any alterations to the TOOL without authorization from NPK Engineering. 11. Use proper lifting equipment and tools when handling or servicing the HAMMER.
FORWARD The NPK HYDRAULIC HAMMER is a rugged boom mounted demolition tool that can be operated underwater by making certain modifications and following the procedures in this manual. Read and understand the SAFETY INFORMATION and operating instructions in the NPK OPERATORS MANUAL before operating the hammer. If there are any questions, call the NPK Service Department at 1-800-225-4379.
AIR SUPPLY Air Compressor The air compressor capacity varies with the hammer size. The base underwater kit is designed so that compressed air is supplied to the striking chamber area during operation. The addition of a portable air compressor capable of 100 cfm constant and a air flow regulator are required.
(AS2), (exhaust valve housing) part number 11056728 (E208 through E225) (GH7 through GH23) or 3/4” hex head pipe plug, (AS3), (exhaust valve housing) part number 11057403 (E240A, E260A, GH30, GH40, GH50). B. Install the adapter elbow, (CF), (supplied by the dealer).
Page 9
NOTE: Extra procedures may be required to remove the drain plug (B). 2a. For the E210A, E213, E216, E220, E225, GH7, GH9 and GH15 hammers, all that is needed is to remove the drain plug (B) and replace it with the solid plug.
H226-2030 H226-5240 H227-2000 *Consult the NPK Sales Department for part information. **Support block not required for field modification. Note: You must provide the hammer bracket part number. That part number is stamped on the aluminum tag that is affixed to the hammer bracket or it is...
MAIN VALVE SPOOL MODIFICATION If the hammer is to be submersed deeper than the main valve case, the valve spool will need to be modified so that the cold water will not affect the hammer’s operation. Submerging the entire hammer in cold water sometimes causes the valve spool (Z) to stick.
Page 12
The chart below gives the standard spool part number and the modified spool part number. If you have any questions, call the NPK Service Department at 800-225-4379. NPK Underwater Application Valve Spool Modification (All dimensions are metric – mm)
Page 13
11. Install the four socket head cap screws (OO) and torque to the value found in the NPK hammer service manual. 12. Re-install the upper support block and turn the shut-off valves to the “ON” position. The hammer is now ready to be put back into service.
If the unit is equipped with a Autolube, it is still recommended that the hammer is greased manually every hour. Before Start-Up Grease the hammer per the instructions in the NPK HYDRAULIC HAMMER SERVICE MANUAL. Setting the Air Pressure 1.
After completing the procedures described above, position the hammer as illustrated below and discharge the nitrogen gas inside the head cap completely, using the NPK Charge Adapter. b. While keeping the charge valve in an OPEN state, run the engine at a low speed and actuate the hammer foot switch for 2 to 3 seconds.
Need help?
Do you have a question about the GH7 and is the answer not in the manual?
Questions and answers