  • Page 1 Installation, Care, and Maintenance Manual Flygt 2052, 2066, 2102...
  • Page 2 Xylem or Xylem´s it is intended; representative during the guarantee period; – that all service and repair work is done by that the product is used only under conditions a workshop authorized by Xylem;...
  • Page 3: Table Of Contents

    Installation, care and maintenance 2052, 2066, 2102 Contents Safety Electrical connections ___________________________________ 4 _____________________ 9 Notes for EX-Products _________________________ 4 Operation _______________________________ 26 Caution statement for MSHA _____________ 5 Care and maintenance ___________________ 26 Product description ______________________ 6 Safety precautions _________________________ 26 Applications _______________________________ 6 Inspection ________________________________ 26 Specific technical data _______________________ 6...
  • Page 4: Safety

    — All mechanical work on the explosion-proof in the part list for the product. motor section must be performed by personnel authorized by Xylem. — According to the ATEX directive the Ex-pump must be fully submerged. The pump must —...
  • Page 5: Product Description

    Installation, care and maintenance 2052, 2066, 2102 Product description Applications Specific technical data This Installation, Care and Maintenance manual applies For specific data regarding Your pump, please see Parts to a submersible Flygt pump. If You have bought an List. Ex-approved pump (please see approval plate on Your pump or Parts List) special handling instructions apply as WARNING! described in this document. Only Ex-approved pumps may be The pumps are intended to be used for: used in an explosive or flammable pumping of water which may contain abrasive par-...
  • Page 6: General Design

    Installation, care and maintenance 2052, 2066, 2102 General design of a Flygt drainage pump 1. Motor The pump has a twin mechanical seal. One inner and one outer, with an intermediate oil housing. Squirrel-cage 1-phase (2052, 50/60 Hz, 2066 and 2102, 60 Hz) or 3-phase induction motor for 50 Hz or 60 Hz. 4. Shaft The motor is started by means of direct-on-line (2052) or The shaft is delivered with the rotor as an integral part. Y/D start (2102). 5. Cooling The motor can be run continuously or intermittently with a The stator is cooled by the pumped liquid passing through maximum of 30 evenly spaced starts per hour.
  • Page 7: Transportation And Storage

    3. Use a safety helmet, safety goggles and protective Place the pump on a base which will prevent it from sinking shoes. into a soft sump bottom. Alternatively, the pump can be suspended by its handle just above the sump bottom. 4. Do not ignore the risk of drowning. Consult your nearest Xylem representative regarding: 5. A first aid kit must be available. choice of peripheral equipment. At certain installations and opera- other problems in connection with installation. tion points on the pump curve the...
  • Page 8: Electrical Connections

    Failure to heed this warning may phase leads. cause a lethal accident. For 1-phase pumps going in wrong direction, please contact Make sure that the earth lead is cor- your nearest Xylem representative. rectly connected by testing it. Remember that the starting surge with the direct-on line start can be up to six times higher than the rated current. Check that the mains voltage and frequency agree with Make sure that the fuses or circuit breakers are of the the specifications on the pump data plate.
  • Page 9 Installation, care and maintenance 2052, 2066, 2102 1~ operation with built-in starter Connections valid for: 2052 (0.75/0.8 kW) Without floating switch Without floating switch 110-115 V 50/60 Hz 220-230 V 50/60 Hz 1-PHASE SUPPLY 1-PHASE SUPPLY *SUBCAB AWG *SUBCAB AWG TERMINAL BOARD TERMINAL BOARD CONTACTOR CONTACTOR START...
  • Page 10 Installation, care and maintenance 2052, 2066, 2102 1~ operation with external starter Connections valid for: 2052 (1.0/1.3 kW) SUBCAB/SUBCAB AWG: No. Lead Pump terminal board The stator leads are colour-marked as follows: Brown (Red) U1 = Red Black (Black) U2 = Brown Blue (White) U5 = Yellow Earth (PE) Yellow/Green U6 = Green Z1 = Blue...
  • Page 11 Installation, care and maintenance 2052, 2066, 2102 CABLE CHART SUBCAB 4GX/SUBCAB AWG, SUBCAB 4GX/SUBCAB AWG, ® ® ® ® 6-leads, Y 6-leads, Y 2052,2066,2102 2052,2066,2102 T1 T2 ® SUBCAB ® ® SUBCAB SUBCAB 4Gx# ® SUBCAB # AWG/4 # AWG/7 T1 T2 T1 T2 T1 T2...
  • Page 12 Installation, care and maintenance 2052, 2066, 2102 CABLE CHART SUBCAB 4GX/SUBCAB AWG, SUBCAB 4GX/SUBCAB AWG, ® ® ® ® 6-leads, D 6-leads, Y 2052,2066,2102 2052,2066,2102 T1 T2 ® SUBCAB ® SUBCAB 4Gx# ® SUBCAB # AWG/4 # AWG/7 # AWG/3-2-1-GC L1 L3 L2 T1 T2 L1 L2 L3...
  • Page 13 Installation, care and maintenance 2052, 2066, 2102 50/60 Hz, 1~ with terminal board Connections valid for: 2066 SUBCAB/SUBCAB AWG*: Mains Lead Pumpterminal The stator leads are colour-marked as follows: board U1 = Red Brown (Red*) U2 = Brown Blue alt. Grey (White*) 5 Z1 = Yellow Black (Black*) Z2 = Black Earth (PE) Yellow/Green...
  • Page 14 Installation, care and maintenance 2052, 2066, 2102 CABLE CHART SUBCAB 4GX/SUBCAB AWG, SUBCAB 4GX/SUBCAB AWG, ® ® ® ® 6-leads, D 6-leads, D 2052,2066,2102 2052,2066,2102 ® ® SUBCAB SUBCAB L1 L3 L2 L3 L2 W2 U1 V1 U2 W1 V2 Bild 76 Bild 77 SUBCAB...
  • Page 15 Installation, care and maintenance 2052, 2066, 2102 CABLE CHART SUBCAB 4GX, 6-leads, Y/D SUBCAB 7GX, 6-leads, Y/D ® ® 2052,2066,2102 2052,2066,2102 SUBCAB SUBCAB SUBCAB Bild 83 Bild 82 Terminal Terminal Mains Lead Contactor board Mains Lead Contactor board black black black black black...
  • Page 16 Installation, care and maintenance 2052, 2066, 2102 CABLE CHART 60 Hz, 1~ with terminal board Connections valid for: 2102 SUBCAB/SUBCAB AWG*: Mains Lead Pump terminal board The stator leads are colour-marked as follows: Brown (Red*) U1 = Red Black (Black*) V1 = Brown Blue (White*) W1 = Yellow Earth (PE) Yellow/Green U2 = Green V2 = Blue...
  • Page 17 Installation, care and maintenance 2052, 2066, 2102 CABLE CHART SUBCAB 4GX/SUBCAB AWG, SUBCAB 4GX/SUBCAB AWG, ® ® ® ® 60 Hz only, 9-leads, 230 V, Y// 60 Hz only, 9-leads, 230 V, Y// 2052,2066,2102 2052,2066,2102 ® SUBCAB 4Gx# ® SUBCAB # AWG/4 # AWG/7 ®...
  • Page 18 Installation, care and maintenance 2052, 2066, 2102 CABLE CHART SUBCAB 4GX/SUBCAB AWG, SUBCAB 4GX/SUBCAB AWG, ® ® ® ® 60 Hz only, 9-leads, 460 V, Yser. 60 Hz only, 9-leads, 460 V, Yser. 2052,2066,2102 2052,2066,2102 ® SUBCAB 4Gx# ® SUBCAB # AWG/4 # AWG/7 ®...
  • Page 19 Installation, care and maintenance 2052, 2066, 2102 CABLE CHART SUBCAB 4GX/SUBCAB AWG, SUBCAB 4GX/SUBCAB AWG, ® ® ® ® 60 Hz only, 12-leads, 230 V, Y// 60 Hz only, 12-leads, 460 V, Yser. 2052,2066,2102 2052,2066,2102 ® ® SUBCAB SUBCAB ® ®...
  • Page 20 Installation, care and maintenance 2052, 2066, 2102 CABLE CHART SUBCAB 7GX, 6-leads, Y/D SUBCAB 7GX, 6-leads, Y/D ® ® 2052,2066,2102 2052,2066,2102 L1 L2 L2 L3 ® ® SUBCAB SUBCAB 7G2.5+S(2x0.5) ® SUBCAB T1 T2 T16 T15 T2 T1 U1 W2 V1 U2 W1 V2 W1 V2 Bild 12B...
  • Page 21 Installation, care and maintenance 2052, 2066, 2102 CABLE CHART SUBCAB 4GX/SUBCAB AWG, SUBCAB 4GX/SUBCAB AWG, ® ® ® ® 6-leads, D 6-leads, Y 2052,2066,2102 2052,2066,2102 ® ® SUBCAB SUBCAB ® SUBCAB T1 T2 T1 T2 U1 V1 Bild 43 Bild 79 SUBCAB SUBCAB ©...
  • Page 22 Installation, care and maintenance 2052, 2066, 2102 CABLE CHART SUBCAB 4GX, 6-leads, Y/D ® 2052,2066,2102 ® ® SUBCAB SUBCAB T1 T2 T1 T2 Bild 54 Mains Lead Terminal board brown black grey brown black grey yellow/green Control Cable lead Terminal board Stator leads connection: Stator lead Terminal board...
  • Page 23: Operation

    (permissible) motor section must Make sure that the unit cannot roll be performed by authorized Xy- or fall over and injure people or lem personnel. Xylem renounces damage property. all responsibility for work done by untrained, un authorized personnel. EX-PRODUCT: See also under chapter "SAFETY...
  • Page 24 A check of the condition of the oil can show whether there has been an increased leakage. Note! Air/oil mixture can be confused with water/oil mixture. Insert a tube (or hose) into the oil hole. Cover the top end of the tube and take up a little oil from the bottom. Change the oil if it contains too much water, i.e., is heavily emulsified (cream-like), or if the oil housing contains separated water. See "Changing the oil". Check again one week after changing the oil. If the oil contains too much water again, the fault may be: that an oil screw is not sufficiently tight. that the O-ring on an oil screw or its sealing surface is damaged. that the mechanical seal is damaged. Contact a Xylem service shop. Oil quantity 2052 0.2 litres (0.21 US quarts) 2066 0.75 litres (0.79 US quarts) 2102 1.4 litres (1.48 US quarts) WARNING! If the seal leaks, the oil casing may be under pressure. Hold a rag over the oil casing screw in order to prevent splatter.
  • Page 25 Transpose two phase leads if the impeller does not rotate clockwise as viewed from (requires voltage) above. Rotation in the wrong direction reduces the capacity of the pump and the motor may be overloaded. Check the direction of rotation, during non-load every time the pump is reconnected. Pipes, valves and other pe- Repair faults and notify supervisor of any faults or defects. ripheral equipment Insulation resistance in the Contact a Xylem service shop. stator...
  • Page 26: Changing The Oil

    Installation, care and maintenance 2052, 2066, 2102 Changing the oil Oil casing WARNING! If the seal leaks, the oil casing may be under pressure. Hold a rag over the oil screw to prevent splatter. Unscrew the nuts and remove the strainer (only 2052). Unscrew the oil screw. Turn the pump so that the oil hole faces down w ards. It is easier to drain the oil if another oil screw is also re- moved.
  • Page 27 Installation, care and maintenance 2052, 2066, 2102 Remove the nuts. Remove the lower diffuser. Remove the impeller nut (the screw = 2102). Only 2102 Pull off the impeller. Do not pry off the impeller, since it can easily be dam- aged. If it is necessary to change the diffuser, the oil has to drained away. Only 2102 Then remove the studs and the diffuser. Installing the impeller Make sure that the end of the shaft is clean and free of burrs. Polish off any flaws with fine emery cloth.
  • Page 28: 2066 (Optional), 2102

    Installation, care and maintenance 2052, 2066, 2102 Fit the adjusting studs properly. Grease end of shaft. Press the impeller onto the shaft with the impeller nut. Tighten the impeller nut. Tightening torque: 2052 30 Nm 2066 30 Nm 2102 30 Nm Place the second impeller nut on the shaft and tighten it (= 2052). The clearance between the impeller and the oil casing bottom should be 0.2 - 0.3 mm when the impeller is tight- ened. The clearance can be adjusted with the adjusting washers.
  • Page 29: Accessories And Tools

    Xylem supplies level sensors suited for different liquid densities and with different cable lengths. See separate Besides ordinary standard tools, special tools are required brochure. in order to perform the neces sary care and maintenance of the pump. Please see Parts List for order No. Start and control equipment For further information on tools, see Xylem s Tool Cata- Xylem has suitable start and control equipment for the logue. pump. Contact Xylem for further information. Service log Most recent Pump No. Hours of operation Remarks Sign.
  • Page 30 For more information on how Xylem can help you, go to www.xyleminc.com Refer to www.xylemwatersolutions.com/contacts/ for contact details of your local sales and service representative.