01103039 0409 INSTALLATION Table of contents Notice Date Page MANUAL Pages/Chapters General instructions Environmental information ..................1/1 Preliminary instructions ..................2/1 Note about the A.C. power ..................3/1 Handling/Weight Handling ........................1/2 Packing- Weight ....................1/3 Technical characteristics Ironer ........................1/4 Sound level ......................3/4 Installation/Putting into service Installation ......................1/5 Levelling the machine ....................2/5 Mechanical installation ..................3/5...
01103039 0409 INSTALLATION 1. Environmental information Notice Date Page MANUAL Environmental information Concerned by providing the end user with useful and necessary environmental information, we wish to precise : • Data about energetic consumptions, wastes (atmospheric and liquid) and sound level are indicated in the paragraph "Technical characteristics".
01103039 0409 INSTALLATION 1. Preliminary instructions Notice Date Page MANUAL This machine should be installed in conformance to the health and safety regulations, and only used in a suffi ciently aerated area. Check the instructions before installing or using the machine. SAFETY The mechanical and electrical installation of the machine...
01103039 0409 INSTALLATION 1. Preliminary instructions Notice Date Page MANUAL Note about the A.C. power • According to the EN 60204-1:1997 standard, the machine is provided for AC supplies corresponding to the extracted caracteristics below : 4.3.2 AC supplies Voltage: Steady state voltage: from 0.9 to 1.1 of nominal voltage.
Page 7
01103039 0409 INSTALLATION 1. Preliminary instructions Notice Date Page MANUAL This page is left blank on purpose.
01103039 0409 INSTALLATION 2. Handling Notice Date Page MANUAL WARNING It is compulsory that all these operations are undertaken by handling specialists. 1/ Lifting with handling straps For safety reasons the lifting with handling straps (A) is recommended rather than any other lifting way.
Page MANUAL Sound level Airborne noise emitted by the machine (values establiqhed from measurements made on the machine at points A, B, C and D). (40”) D0267 Weighted sound pressure level (A) in dB (A) for an IC433. IC43316 IC43320...
However, note that if you can, it is recommended that you should leave suffi cient space for maintenance of the heating box to avoid having to move the dryer (minimum length A on the left side). (79.92") IC43316: 1,60m : 2030 (96.26") IC43320:...
01103039 0409 INSTALLATION 5. Installation Notice Date Page MANUAL Screw off the screws to remove the red transport angles (benchmark E) with a key. CAUTION : do not remove these screws. Keep these angles to eventually lift the machine. Block the screws which maintained these angles.
01103039 0409 INSTALLATION 5. Installation Notice Date Page MANUAL Mechanical installation Check with a spirit level placed on the sole plate for the longitudinal direction and the ma- chine top cover for the transverse direction (see sketch). air level D0250 air level D0251...
01103039 0409 INSTALLATION 5. Installation Notice Date Page MANUAL Machine with steel cylinder option Before the very fi rst starting operation, it is ne- cessary to take off the protective paper rolled round the heating cylinder (for steel cylinder only). To do so, you have to install the crank (V) that you have found in the caisson together with this instruction handbook (see photo).
01103039 0409 INSTALLATION 5. Installation Notice Date Page MANUAL Electricity power supply CAUTION Prior to use, the ironer should be plugged into a correctly earthed power socket complying with the standards in force. SAFETY The electrical installation of the machine must be undertaken by qua- lifi...
Page 18
01103039 0409 INSTALLATION 5. Installation Notice Date Page MANUAL Electricity power supply IMPORTANT : Check that the mains voltage is correct and that your installation is powerful enough before connecting the machine. Insert the feeding cable in the designed port (letter G on the foundation plan on the rear left side of the caisson).
Page 19
01103039 0409 INSTALLATION 5. Installation Notice Date Page MANUAL Connect the power supply cable on the machine main switch. Check the order of phases on the switch terminals (see marks L1, L2 and PE on the machine main switch). O f f Connection diagrams for power supply transformer (T1) as a function of the va- rious customer power supply voltages.
Page 20
Installed Rated Main circuit breaker Heating Supply Voltage Type Power Intensity or Fuse IC43316 208/240 V P+N+E ~ 60 Hz 0.5 kW 2 x 10 A IC43320 208/240 V P+N+E ~ 60 Hz 0.5 kW 2 x 10 A IC43316 120 V P+N+E ~ 60 Hz 0.5 kW...
01103039 0409 INSTALLATION 5. Installation Notice Date Page MANUAL Gas connection The installation of the gas supply should be carried out by trained staff. To be provided by the customer a fi lter, a manual stop valve and a pressure reducing valve PROPANE 14.9 w.c, [3.7kPa] or NATURAL GAS according to the kind of gas used.
Page 22
01103039 0409 INSTALLATION 5. Installation Notice Date Page MANUAL The machine is adjusted at the plant to be suitable for the kind of gas specifi ed on the order. If you have to supply your machine with gas in a family different from the gas for which your machine was adjusted, proceed as follows: Check that the diameter of the injectors is adequate for the kind of gas of your installation (see table of injectors).
Page 23
01103039 0409 INSTALLATION 5. Installation Notice Date Page MANUAL IMPORTANT Adjustments should be made by qualifi ed personnel only. Adjustment and checking of the outlet pressure Top view of gas control The gas outlet pressure of the solenoid valve is adjusted at the factory. If you Pressure regulator have to make another adjustment, proced...
Page 24
01103039 0409 INSTALLATION 5. Installation Notice Date Page MANUAL TABLE OF CORRESPONDENCES - Ironer IC43316 Heat Working supply Ø of Pressure at Type of emission Qn Consumption Consumption pressure in Hi in MJ/m³ injectors injectors in kPa in kW (Btu/h) Mn in kg/h Vn in m³/h...
Page 25
01103039 0409 INSTALLATION 5. Installation Notice Date Page MANUAL IMPORTANT Tightness test after installation The gas leak test is performed as follows: Paint pipe joints, pilot gas tubing connections and inspect out- lets with rich soap and water solution ; do not use an aggressive soap.
01103039 0409 INSTALLATION 5. Installation Notice Date Page MANUAL Connection of the ironer evacuation system Fresh air inlet To allow the dryer ironer to work at its best, it is important that the laundry air inlet passes through an opening from the outside.
Page 27
These conditions are absolutely essential for the correct working of the machine. Fan maximum flow rate with no pressure: - 426 m³/h (250 cfm) for a IC43316 machine. - 515 m³/h (303 cfm) for a IC43320 machine. Maximum pressure available with no flow: 54 mm H O (2.2 inH...
Page 28
01103039 0409 INSTALLATION 5. Installation Notice Date Page MANUAL The duct must lead to the outside and must be fi tted with protection against the weather and foreign bodies. D0252...
01103039 0409 INSTALLATION 6. Operating inspection Notice Date Page MANUAL Operating inspection The operating inspection must be done by an approved technician. WARNING Always make sure that the fan is rotating in the right direction. The fan must rotate in the direction shown on the arrow glued on the motor of the fan.
01103039 0409 INSTALLATION 7. Appendices Notice Date Page MANUAL Conversion of measurement units The following is a list of correspondences of the main frequently used units, to avoid the need to use measurement unit con- version tables. bar: bar = 100 000 Pa pound: 1 lb = 453.592 37 g 1 bar = 1.019 7 kg/cm²...
Page 32
Share more of our thinking at www.electroluxprofessional.com...
Need help?
Do you have a question about the IC43316 and is the answer not in the manual?
Questions and answers