TECHNICAL DATA EQUIPMENT INTERFACE INSTRUCTION INSTALLATION Parts List Installation Precaution Selecting the Mounting Area Tools and Safety Gears Necessary Mounting the Battery Installation Connection Inspection Starting the SUNSYNK-G5.3 Battery Symbol Explanation INSPECTION, CLEANING AND MAINTENANCE General Information Inspection Cleaning Maintenance Storage TROUBLESHOOTING BATTERY RECOVERY Recovery Process and Steps of Cathode Materials Recovery of Anode Materials...
INTRODUCTION Thank you for choosing Sunsynk’s energy storage system. SUNSYNK-G5.3 lithium iron phosphate battery is one of the new energy storage products developed and produced by SUNSYNK. SUNSYNK-G5.3 is especially suitable for application scenarios of high power, limited installation space, and long cycle life. It can be used to support reliable power for various types of equipment and systems.
It is crucial and necessary to read the user manual carefully (in the accessories) before installing or using the SUNSYNK-G5.3 battery. Failure to do so or to follow any of the instructions or warnings in this docu- ment can result in electrical shock, serious injury, death, or damage to the battery, potentially rendering it inoperable.
Liquid fire extinguishers are forbidden. In case of fire, only dry fire extinguishers can be used. Please do not open, repair, or disassemble the battery except staff from SUNSYNK or authorized by SUNSYNK. We do not undertake any consequences or related responsibility because of violation of safe- ty operation or violation of design, production, and equipment safety standards.
Damaged Battery A damaged battery should not be used and should be returned to Sunsynk or properly discarded via a recy- cling facility. Leaking electrolytes can cause skin irruption and chemical burns, so contact should be avoided. Flush eyes with plenty of water for at least 15 minutes, occasionally lifting the upper and lower eyelids.
Basic System Architecture SUNSYNK-G5.3 dimensions are presented below: Contact our customer service or an accredited seller for precise information about application cases of the SUNSYNK-G5.3 battery. SUNSYNK-G5.3 | User Manual...
DC Usable Energy, test conditions: 90% DOD, 0.3C charge & discharge at 25° C. System usable energy may vary due to system configuration parameters. The current is affected by temperature and SOC. The warranty is due whichever reached first of warranty period or energy throughout. SUNSYNK-G5.3 | User Manual...
DC 125A Circuit Over current protection, cut off the power supply. Breaker Grounding Bolt Used for the battery connecting to the PE. (USB port) Used to insert USB flash drive for battery upgrade. SUNSYNK-G5.3 | User Manual...
Page 10
Protection and Alarm Management and Monitor Charge/Discharge End Intelligent Protect Mode Charge Over Voltage Intelligent Charge Mode Discharge Under Voltage Protect, Charge Current Limit Charge/Discharge Over Current Intelligent Protect Mode High/Low Temperature(cell/BMS) Intelligent Protect Mode Short Circuit Protect SUNSYNK-G5.3 | User Manual...
Screws M6*10 x8 600 mm Pair of 4AWG 1500mm Pair of 4AWG DC Battery Power Cable and Power Cable and RJ45 Com- RJ45 Communication User Manual x1 munication Cable x1 Cable x1 One Dry Contact Terminal SUNSYNK-G5.3 | User Manual...
The location of the battery should follow the operating temperature range and IP rating specified in the Specification section of this manual. The SUNSYNK-G5.3 is designed for outdoor use (IP65). But please avoid direct sunlight, rain exposure, and snow laying up during installation and operation. Although the batteries run at a low temperature, proper airflow around the batteries is recommended.
If insulated tools are not available, cover the entire exposed metal surfaces of the available tools, except their tips, with electrical tape. We recommend wearing the following safety gear when dealing with the battery pack installation or mainte- nance. Safety Gloves Safety Goggles Safety Shoes SUNSYNK-G5.3 | User Manual...
Installation To install the SUNSYNK-G5.3 battery, follow the steps: Install the SUNSYNK-G5.3 battery on the wall, as shown in the previous section. Connect the communication cable to the inverter. The first battery communication cable should connect ...
Symbol Explanation Many symbols are present with the battery product and used materials to install it. Next, a list of symbols and their meanings is presented. SUNSYNK-G5.3 | User Manual...
During the maintenance process, do not re-install the batteries in the SUNSYNK-G5.3. Otherwise, the performance of the product will be reduced; It is forbidden to dismantle any battery in the SUNSYNK-G5.3, and it is not permitted to dissect the bat- tery;...
The voltage sampling terminal is disconnected. BMS fault Replace the battery. The cell temperature sampling circuit is The fuse in the voltage sam- faulty. pling circuit is blown. The cell temperature sensor has failed. SUNSYNK-G5.3 | User Manual...
Page 18
-20ºC protection against abnormal- ity. After checking the above data, please send it to our personnel service. Thus, we will evaluate your problem and reply with the best solution. SUNSYNK-G5.3 | User Manual...
99%, which can be used to refine electrolytic copper further. Recovery of Diaphragm The diaphragm material is mainly harmless and has no recycling value. List of Recycling Equipment Automatic dismantling machine, pulverize, wet gold pool, etc. SUNSYNK-G5.3 | User Manual...
Use Class 9 Miscellaneous Dangerous Goods and UN Identification labels for transportation of lithium-ion batteries, which are assigned Class 9. Refer to relevant transportation documents. The Class 9 Miscellaneous Dangerous Goods and UN Identification Label is presented next: SUNSYNK-G5.3 | User Manual...
Page 21
Email us: sales@sunsynk.com Call us UK : +44 151 832 4300 VAT Number: 175669460 UK Address: Sunsynk, 17 Turnstone Business Park, Mulberry Avenue, Widnes, Cheshire, WA8 0WN. wered by...
Need help?
Do you have a question about the SUNSYNK-G5.3 and is the answer not in the manual?
Questions and answers