Disclaimer Leonton Technologies, Co. Ltd. provides this manual without warranty of any kind, expressed or implied, including but not limited to the implied warranties of merchantability and fitness for a particular purpose.
Page 3
Ceci est un produit de classe A. Dans un environnement domestique, ce produit peut être utilisé en présence d'interférences radio. This document is the current official release manual. Please check our website (www.leonton.com) for any updated manual or contact us by e-mail (sales@leonton.com).
OVERVIEW This series is rated IP30 and installation by DIN Rail. Each unit of this industrial gigabit PoE compact size design for short installation space provided 4*10/100/1000Base-TX with IEEE 802.3bt compliant ports (90W) convert to 1 dual-rate (100/1000) SFP slot, suitable for Ethernet and SFP conversion applications. In order to prevent unregulated voltage, this series provides high EFT and ESD protection.
Package Contents ⚫ 1 - CBG2-0501-SFP-Lite-12(-T) - Unit weight: 0.75 kg (1.65lb), Shipping weight: 1.03kg (2.27lb) ⚫ 2 - Wall mounting brackets and screws ⚫ 1 - Quick installation guide Safety Precaution Attention If the DC voltage is supplied by an external circuit, please use a protection device on the power supply input.
HARDWARE DESCRIPTION Physical Dimensions Figure 2.1, below, shows the physical dimensions of CBG2-0501-SFP-Lite-12 series. (W x H x D) is 51mm x 102mm x 90mm Figure 2.1: Physical Dimensions...
Figure 2.2: The Front Panel Top View Figure 2.3, below, shows the top panel of the CBG2-0501-SFP-Lite-12 series switches that is equipped with one 6-pin removal terminal block connector for dual DC power inputs (9-55VDC). Figure 2.3: Top Panel View...
LED Indicators There are LED light indicators located on the front panel of the industrial switch that display the power status and network status. Each LED indicator has a different color and has its own specific meaning, see below in Table 2.1. Table 2.1: LED Indicators Color Description...
Page 10
Red + Blue The actual PoE Consumption of all connected working PDs budget was 71 - 90% Blinking The actual PoE Consumption of all connected (Red) working PDs budget was 91 - 100% (1 time/s) Connected to network, 10/100/1000Mbps Copper Port Green Blinking Networking is active, 10/100/1000Mbps...
PoE Port LED Indicators The LED light indicators on the PoE copper port can help the user know if an event once occurs or is happening. When the event is happening, user can verify the event from the Dual-color LED status. If the port has recovered from an event, user can verify the event from the blinking frequency of the PoE LED(5 seconds as a cycle,).
Page 12
• Cable Short Event When the working PD encounters a cable short event, the PoE Port LED will act cyclically as below until the port is recovered from the event: After the PoE port is recovered from the Cable Short event, the PoE LED of the port will act cyclically as below until the event indicator is clear manually: **AF/AT: Amber;...
Dip Switch Setting • PRRT Dip Switch ON: Enable “PD Remote Reset Technologies (PRRT)” function. The PRRT function allows user to remotely reboot the PoE Ethernet switch and reset the connected powered device (PD). When the fiber link down for 3 seconds, the PoE Ethernet switch will be reboot and keep detecting if the converter receives signal until the fiber connection is recovered and the signal is received stably.
Ethernet Ports RJ-45 Ports (Auto MDI/MDIX) The RJ-45 ports are auto-sensing for 10Base-T, 100Base-TX or 1000Base-T devices connections. Auto MDI/MDIX means that the switch can connect to another switch or workstation without changing the straight-through or crossover cabling. See the figures as below for straight-through and crossover cabling schematics.
Cabling Use the four twisted-pair, category 5e, or the above cabling for RJ-45 port connections. The cable between the Switch and the link partner (switch, hub, workstation, etc.) must be less than 100 meters (328 ft.) long. The small form-factor pluggable (SFP) is a compact optical transceiver used in optical communications for both telecommunication and data communication applications.
Page 16
Step 2. Insert the fiber cable of the LC connector into the transceiver as shown below in Figure 2.7. Figure 2.7: LC Connector to the Transceiver To remove the LC connector from the transceiver, please follow the steps shown below: Step 1.
Wiring the Power Inputs Caution: Please follow the below steps to insert the power wire. Attention: Veuillez suivre les étapes ci-dessous pour insérer le câble d'alimentation. Step 1. Insert the positive and negative wires into the PWR1 (V1+, V1-) and PWR2 (V2+, V2-) contacts on the terminal block connector as shown below in Figure 2.10.
Wiring the Fault Alarm Contact The fault alarm contact is in the middle of the terminal block connector as the picture shows below in Figure 2.12. By inserting the wires, it will detect the fault status including power failure or port link failure (managed industrial switch only) and form a normally open circuit.
MOUNTING INSTALLATION DIN-Rail Mounting The DIN-Rail is pre-installed on the industrial Ethernet Switch from the factory. If the DIN-Rail is not on the industrial Ethernet Switch, please see Figure 3.1 to learn how to install the DIN-Rail on the Switch. Figure 3.1: The Rear Side of the Switch and DIN-Rail Bracket Follow the steps below to learn how to hang the industrial Switch.
Page 20
Step 4. Lightly pull down the bracket on to the rail as shown below in Figure 3.3. Figure 3.3: Stable the Switch on DIN-Rail Step 5. Check if the bracket is mounted tightly on the rail. Step 6. To remove the industrial Switch from the rail, do the opposite from the above steps.
Wall Mounting Follow the steps below to mount the industrial Switch using the wall mounting bracket as shown below in Figure 3.4. Step 1. Remove the DIN-Rail bracket from the industrial Switch by loosening the screws. Step 2. Place the wall mounting brackets on the top and bottom of the industrial Switch. Step 3.
HARDWARE INSTALLATION Installation Steps This section will explain how to install CBG2-0501-SFP-Lite-12 series. Installation Steps Step 1. Unpack the industrial Switch from the original packing box. Step 2. Check if the DIN-Rail bracket is screwed on the industrial Switch. •...
Page 23
Caution: If the equipment is used in a manner not specified by the manufacturer, the protection provided by the equipment may be impaired. Attention: Si l'équipement est utilisé d'une manière non spécifiée par le fabricant, la protection fournie par l'équipement peut être altérée. Caution: The installation that the safety to any system incorporating the equipment is the responsibility of the assembler of the system.
Check for loose power connections, power losses or surges at the power outlet. ◆ Please contact Leonton for technical support service, if the problem still cannot be resolved. ● If the industrial Switch LED indicators are normal and the connected cables are correct but the packets still cannot transmit, please check the system’s Ethernet devices’...
Need help?
Do you have a question about the CBG2-0501-SFP-Lite-12 and is the answer not in the manual?