Download Print this page

TMG -LPA10 Product Manual

10ft x 10ft aluminum louvred pergola

Advertisement

Quick Links

PRODUCT MANUAL
V2022.04.10
MODEL TMG-LPA10
10ft x 10ft Aluminum Louvred
Pergola
Please read and understand the product manual completely before assembly
Check against the parts list to make sure all parts are received
Wear proper safety goggles or other protective gears while in assembly
Do not return the product to dealer. They are not equipped to handle your requests.
Missing parts or questions on assembly?
Please call: 1-877-761-2819 or email: cs@tmgindustrial.com
ww w. t m g in d us tr ia l. c o m
Toll Fr ee :1 - 877- 7 61- 2 819

Advertisement

loading
Need help?

Need help?

Do you have a question about the TMG-LPA10 and is the answer not in the manual?

Questions and answers

Summary of Contents for TMG TMG-LPA10

  • Page 1 PRODUCT MANUAL V2022.04.10 MODEL TMG-LPA10 10ft x 10ft Aluminum Louvred Pergola Please read and understand the product manual completely before assembly Check against the parts list to make sure all parts are received Wear proper safety goggles or other protective gears while in assembly Do not return the product to dealer.
  • Page 2: Main Specifications

    Main Specifications : - Overall assembled size : W2.94 x L2.94x H3.00(m) / 9’7x 9’7 x 9'8 (ft) Prior to assembly Please read the instructions carefully before installation. It is important to follow your local safety regulations and industry standards during installation. Regulations may include but are not limited to : - Safety helmets, protective eyewear, and clothing.
  • Page 3 TMG-LPA10 Part List Parts Graphical Description Length code ① Lattice tube 150x50x2940mm ② 150x50x2940mm Beam tube ③ Short beam tube 100x100x2360mm ④ Post 150x150x2868mm SS bolt M10x170 ⑤ ⑥ SS nut ⑦ Base 140mm*140mm ⑧ screw M4.2*16mm ⑨ screw M5*19mm...
  • Page 4 Installation steps Step 1 : Fix short beam into the posts with bolts. Insert each short beam 4”(#3) into two posts with bolts. Parts used in this step : - (4) Posts (#4) - (2)Short beam (#3) - (8) Bolts (#5) - (16) Bolts nuts (#6) ww w.
  • Page 5 Step 2 : Fix brackets to beams with screws. Parts used in this step: - (2) Beam tube (#2) - (32) Screw M4.2x16 (#8) - (16) Bracket (#10) ww w. t m g in d us tr ia l . c o m P4/9 Toll Fr ee : 1 - 87 7 - 7 61 - 2 81 9...
  • Page 6 Step 3: Mark the ground in the final building location with a line showing the positions of base plates. All lines shouldbe drawn from center to center of all baseplate tubes. Diagonal line X must be equal toY. Baseplates: all baseplates must be installed firmly with expansion bolts (#12)on this step.
  • Page 7 Step 4 : Put cover to each post from bottom, then fix post frame to baseplate. Parts used in this step: - (4) Cover (#11) - (16) Screw (#8) ww w. t m g in d us tr ia l . c o m P6/10 Toll Fr ee : 1 - 87 7- 7 6 1 - 2 81 9...
  • Page 8 Step 5: Fix beams into posts and fasten with bolts. Parts used in this step: - (8) Bolts (#5) - (16) Bolts nuts (#6) ww w. t m g i n d us tr ia l . c o m P7/9 Toll Fr ee : 1 - 87 7- 7 6 1 - 2 81 9...
  • Page 9 Step 6 : Fix lattices to beams with screws. Parts used in this step: - (8) Lattice tube (#1) - (64) Screw M5x19 (#9) ww w. t m g i n d us tr ia l . c o m P8/9 Toll Fr ee : 1 - 87 7 - 7 61 - 2 81 9...
  • Page 10 Step 7: Fix cap to posts and short beams. Then fix the with screws. Parts used in this step: - (8) Waterproof cover (#15) - (8) Screw 4.2X16 (#8) 8 15 ww w. t m g i n d us tr ia l . c o m P9/9 Toll Fr ee : 1 - 87 7 - 7 6 1 - 2 81 9...