Kit Installation; Preparation; Installation - Capcom Battle Arena Toshinden 2 Operator's Manual

Table of Contents

Advertisement

:@<yRcoiyii
COIN-OP,
INC.
BATTLE
ARENA
TOSHINDEN
2™
KIT
INSTALLATION
A
WARNING:
MAKE
SURE ELECTRICAL
POWER
TO THE
GAME
IS
OFF
BEFORE STARTING THE
KIT
INSTALLATION.
PREPARATION
1
.
Disconnect and
remove
the old printed
circuit
board(s) or cartridges
from
the
cabinet.
2.
Remove
or
open
the control panel,
and
disconnect
and
remove
the
buttons
and
joystick(s)
from
the control panel.
3.
Remove
any covering
from
the control
panel
overlay,
and
then
remove
the control
panel
overlay.
4.
Place the
Drill
Hole
template over
the control
panel
to
determine
where any
new
holes
should
go.
Center
punch any needed
new
holes
on
the control
panel.
5.
Cut
out the
new
holes
using a
1-3/16"
hole saw.
6.
If
there
is
an
additional control
panel
*cover
(such
as plastic
or lexan) that will
be
utilized,
cut
any
additional
holes
using the
same
template.
*Cover
is
not included
in
the
kit.
7.
Plug
up unused
holes
with a
wood
dowel
(1-
1/8"
diameter)
and sand any rough
edges.
INSTALLATION
Marquee
Installation
8.
Remove
the
marquee
glass,
marquee
overlay,
and
the
cabinet graphics.
9.
Install
the
new
marquee and
replace the
*glass.
*Glass
is
not included
in
this
kit.
Control Panel
Overlay
Installation (See
Figure
1)
10.
The
control
panel overlay
in
the
kit
is
oversized
to
accommodate most
control panel
sizes.
Center
the overlay
on
the control panel, leaving
some
excess
material
at
the
edges.
1
1
.
Remove
the protective
backing
from
the
overlay
and
press
it
down
on
the control panel,
keeping
it
properly
aligned.
Press
it
down
firmly,
smooth
out
any
bubbles,
and
press
it
over
the edges.
12.
Trim
any
excess
from
the overlay.
Place
the
drill
hole template
on
top of
the overlay, aligning
it
with
the joystick
holes.
Pierce through
the overlay
at
each
control panel hole.
Then,
cut
away
overlay
material
covering
the
joystick
and
button
holes.
Remove
the
template
and
clean
off the overlay.
13.
Peel
off the
backings of
the 6-button
and
joystick decals,
align
over
the control panel holes,
and
press
in
place
on
the
overlay
(refer to
the
drill
hole template
for
proper placement).
Using
a knife,
trim material
from
the
center hole of
the joystick
decal.
14.
Install
the control
panel *cover
(if
required).
Reassembly
of
Components
15.
Install
all
buttons
and
retaining rings
on
the
control
panel
as
shown
in
Figure
2.
Install
two
RED
buttons
to the
immediate
right
of
each
joystick,
install
two
GREEN
buttons
to
the
right
of
the red
ones,
and
install
two
BLUE
buttons
to
the
right
of
the
green
ones.
Proprietary
and
confidential
information> not
to
be
disclosed
or copied without
the
express permission of
CAPCOM®
COIN«OP,
INC.
3

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Battle Arena Toshinden 2 and is the answer not in the manual?

Questions and answers

Table of Contents