Advertisement

Screen House
Owner's Manual
MODEL:
QL04TA2
EASTOAK.COM
OWNER'S MANUAL
1

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Screen House QL04TA2 and is the answer not in the manual?

Questions and answers

Summary of Contents for EAST OAK Screen House QL04TA2

  • Page 1 Screen House Owner’s Manual MODEL: QL04TA2 EASTOAK.COM OWNER’S MANUAL...
  • Page 2 SCREEN HOUSE...
  • Page 3 Questions? Comments? Reach out to us for expert support! support@eastoak.com eastoak.com 1-833-EAST-OAK ( USA ) ( 1-833-327-8625 ) Mon-Fri 8am-8pm EST Follow eastoakliving on Claim your 3-year warranty Please scan the QR code to view the installation video at eastoak.com/warranty EASTOAK.COM OWNER’S MANUAL...
  • Page 4 IMPORTANT INFORMATION DANGER Misuse could result in a serious accident or death. • This screen house is made with flame resistant fabric which meets CPAI- 84 specifications. It is not fireproof. The fabric will burn if left in continuous contact with any flame source. The application of any foreign substance to the screen house fabric may render the flame resistant properties ineffective.
  • Page 5: Parts List

    PARTS LIST User Manual ×1 Ground Stakes Certificate Card x1 6mm*22mm x8 Warranty Card x1 Guyline x4 Φ7.9mm* 211mm Telescoping Poles x2 Storage Bag Sandbags x4 Storage Bag (For Ground Stake) x1 (For Telescoping Poles) x1 Elastic Band x2 Zip-up Bag x1 EASTOAK.COM OWNER’S MANUAL...
  • Page 6: Installation

    INSTALLATION Take out the screen house from the zip-up bag, and remove the elastic band for securing. Please ensure you are in an open space without another person within 3 meters around. Hold the top with your hands (holding all panels), and throw it forward in a vertical position.
  • Page 7 Make the screen house upright, pull open each panel from inside to outside, and adjust it properly to a regular quadrilateral. Pull open each panel from inside to outside. Fastening buckles. EASTOAK.COM OWNER’S MANUAL...
  • Page 8 Connect the telescoping poles with both ends downwards, pass through the woven tapes on the ceiling, insert them into the small bags marked with red circles, and secure them with the touch fasteners on the side. After the installation of all 2 poles, draw the woven tape in the center to the tightest extent, and fix the position.
  • Page 9 Tighten the buckle of the drawstring upwards. Notice: Light needs to be purchased separately. EASTOAK.COM OWNER’S MANUAL...
  • Page 10 Adjust the shape properly, and secure the screen house with ground stakes. If it is used on cement floor, you may fill the provided sandbags with sand and soil, and connect them with guylines. 45¡ Secure the screen house with ground stakes. NOTE: Ground stakes should be inserted into the ground at an angle of 45 degrees and perpendicular to the guylines.
  • Page 11 You may fill the provided sandbags with sand and soil. 45¡ You may fix it on the ground with ground stakes and connect it with guylines. EASTOAK.COM OWNER’S MANUAL...
  • Page 12 FOLD-DOWN Pull out the screen house pegs from the ground, remove the windproof ropes, and empty the sand and soil in sandbags. Loosen the woven tape in the center, pull apart the touch fasteners, take out the ends of telescoping poles from the small bags marked with red circles and then fold them.
  • Page 13 Zip up the screen house on the panel, and push it down directly. The 4 panels will be collapsed into 2 panels. Fold them into one panel. Tidy up the excess material. Zip up the screen house on the panel. EASTOAK.COM OWNER’S MANUAL...
  • Page 14 Please ensure that the product is laid flat and in place without bending or folding. SCREEN HOUSE...
  • Page 15 Folding storage of the screen house. Fold the top panel of the screen house to the bottom of black gauze. NOTE: For the convenience of quick folding, it is recommended to step on the red circle for folding. Press the screen house down with your knee or foot. At this time, the screen house will be separated into the right and left sections.
  • Page 16 Pull them towards yourself, make the right section overlap the left section a little, and then hold them with your right hand. The right section overlap the left section a little, and then hold them with your right hand. Lift your knee or foot, push inwards the position held down by your knee or foot previously with your left hand, and hold it down with your right hand to complete the fold-down.
  • Page 17 Bind and hold the collapsed screen house in place with the elastic band, and put in all accessories. Tips: In case of distortion or deformation of the screen house, it may be caused by the displacement of steel wires, which can be restored by holding any of its corners and shaking it.
  • Page 18: What's In The Box

    Sandbags WARRANTY POLICY GUARANTEED 3-YEAR WARRANTY Thank you for choosing East Oak. This product is covered by our company warranty for up to 3 years from its original purchase date. CLAIM WARRANTY If you’d like to claim your product’s warranty, register your new product on our website at www.eastoak.com/warranty.
  • Page 19 EASTOAK.COM OWNER’S MANUAL...
  • Page 20 support@eastoak.com eastoak.com 1-833-EAST-OAK (USA) SCREEN HOUSE...

Table of Contents