IMPORTANT CAUTION Once installed, the product cannot be detached. Please strictly follow each step in the installation manual. V (X1) • Please check all parts and components to ensure that there are no damages or missing items before starting the construction of the product.
The letter marks on the A/A+Logo/B/C/J D (X1) L (X8) panels should face inward when installing. Recommend wearing protective gloves during assembly. T (X4) J (X1) Front Panel*with east oak logo Back Panel A (X1) A (X1) Bottom Panel Lid Panel Side Panel J (X1)
Page 4
Note: Make sure 3 plastic strips T are mounted E (X3) D (X1) L (X6) correctly. T (X3) A (X1) Front*with east oak logo Left Right Right push For easier installation, plastic hinges E should tilt to the one side, then to the other.
Page 5
Assemble two A panels to B panel. Insert stainless steel tube D to panel A. Ensure the steel tubes D is aligned with panels C. Note: Please using rubber mallet for convenient Assemble two C panels to B and A panels. installation.
Page 6
Assemble the panel J. Line up the plastic Secure the hydraulic rods H into the place on hinges E and secure with 12 screws L. both sides. Fasten the lock bracket-1 G with 2 screws L. F (X8) G (X2) Fasten the lock bracket-2 I with 1 screw L.
• User Manual WARRANTY POLICY GUARANTEED 3-YEAR WARRANTY Thank you for choosing East Oak. This product is covered by our company warranty for up to 3 years from its original purchase date. CLAIM WARRANTY If you’d like to claim your product’s warranty, register your new product on our website at www.eastoak.com/warranty.
Need help?
Do you have a question about the EO-DB22011 and is the answer not in the manual?
Questions and answers