SUPREME SUP15-E230V1 Installation Instructions And Homeowner's Manual

Multi position variable speed blower motor (ecm)
Table of Contents

Advertisement

Quick Links

240 VAC POWER SUPPLY
MULTI POSITION
VARIABLE SPEED BLOWER
MOTOR (ECM)
INSTALLER / SERVICE TECHNICIAN:
USE THE INFORMATION IN THIS MANUAL FOR THE INSTALLATION AND
SERVICING OF THE FURNACE AND KEEP THE DOCUMENT NEAR THE
UNIT FOR FUTURE REFERENCE.
HOMEOWNER:
PLEASE KEEP THIS MANUAL NEAR THE FURNACE FOR FUTURE
REFERENCE.
Printed in Canada
Printed on 100% recycled paper
Models:
SUP15-E230V1
SUP18-E230V1
SUP20-E230V1
SUP23-E230V2
SUP27-E230V2
Caution: Do not tamper with
the unit or its controls. Call a
qualified service technician.
Manufactured by:
Industries Dettson inc
3400 Industrial Boulevard
Sherbrooke, Quebec - Canada
J1L 1V8
2013-10-24
.
X40210 Rev.E

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the SUP15-E230V1 and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Summary of Contents for SUPREME SUP15-E230V1

  • Page 1 240 VAC POWER SUPPLY Models: MULTI POSITION SUP15-E230V1 SUP18-E230V1 VARIABLE SPEED BLOWER SUP20-E230V1 MOTOR (ECM) SUP23-E230V2 SUP27-E230V2 Caution: Do not tamper with INSTALLER / SERVICE TECHNICIAN: the unit or its controls. Call a qualified service technician. USE THE INFORMATION IN THIS MANUAL FOR THE INSTALLATION AND...
  • Page 2: Table Of Contents

    Figure 17 : Wiring diagram (23 kW) ........16 START-UP ............. 8 Figure 15 : Wiring diagram (27 kW) ........17 USE OF MANUAL FURNACE CONTROLS.... 8 Figure 16 : PARTS LIST, Supreme with ECM : SUPxx- OPERATING SEQUENCE ........9 3.3.1. Continuous fan..........9 E230V1 or SUPxx-E230V2.........20 3.3.2.
  • Page 3: Safety

    1.0 ..........SAFETY Ask the technician installing your furnace to show and explain to you the following items: The main disconnect switch or circuit breaker; DANGER, WARNING AND CAUTION The air filter and how to change it (check monthly and clean or replace if necessary); The words DANGER, WARNING and CAUTION are used to Before calling for service, be sure to have the identify the levels of seriousness of certain hazards.
  • Page 4: Positioning The Furnace

    If the static pressure is high in the supply duct because of a CONFIGURATIONS large duct system or the addition of a cooling coil, it is suggested to close down the louvers until the noise or the This furnace requires suitable ductwork. vibration is decreased to a normal level.
  • Page 5: Horizontal Installation

    Refer to Figure 3 for additional details. Figure 3 : Horizontal installation ELECTRICAL SYSTEM The SUPREME furnace is completely pre-wired and all field wiring must be connected to the terminal blocks on the unit. It requires a 240 volt, 2-wire power supply.
  • Page 6: 2.5.1. Thermostat Heat Anticipator Adjustment

    Use flexible hangers to suspend the ducts. heat pump thermostat The SUPREME furnace is equipped with a filter frame for the blower compartment. It must be installed on the outside of one of the three sides or the bottom of the furnace. Once the location of the installation has been determined, use the four square knockouts for ease of cutting the opening.
  • Page 7: Ac/Hp Size

    30/90: 30 second ON delay with no airflow and 90 2.6.2. AC/HP size second OFF delay at 100% airflow profile. Used when it is desirable to allow system coils time to heat-up/cool- Select System Size Installed down in conjunction with the airflow. 0/0: No delay option.
  • Page 8: Installation Of Accessories

    INSTALLATION OF ACCESSORIES airflow to approximately 80% of nominal cooling mode airflow. This reduction will increase the system latent capacity until the humidity falls to a level which causes the WARNING humidistat contact to close its contacts. Electrical shock hazard. 2.7.4.
  • Page 9: Operating Sequence

    • Thermostat closes circuit R to W1 or W2. Figure 13 : Manual Furnace Controls • Furnace delivers the selected electric heat airflow and maximum heating capacity is powered starting the heating elements in sequence with a delay of 8 seconds between each.
  • Page 10: Supply Air Temperature Rise Test

    0.82 x amps. x volts Remove the obstruction and the elements should restart Liter/s= ------------------------- after a few minutes. Diff. temperature ˚C 3.1 x amps. x volts MAINTENANCE CFM = ------------------------ Diff. temperature ˚F Preventive maintenance best avoid 3.4.1. Supply Air Temperature Rise Test unnecessary expense and inconvenience.
  • Page 11: Furnace Information

    FURNACE INFORMATION Model: Serial number: Furnace installation date: Service telephone # - Day: Night: Dealer name and address: START-UP RESULTS Voltage: Total current consumed by the elements: Supply air temperature: Return air temperature: Supply air duct static pressure: Return air duct static pressure: Total pressure: Calculated air flow: Current consumed by the blower motor:...
  • Page 12: Table 1 : Sequence Of Operation

    Table 1 : Sequence of operation Thermostat to Control Control Mode Control Function Board 24 VAC State Electric Heat only Continous Fan Fan ON at the selected continous fan CFM (Fan switch ON) Fan OFF Fan ON at 50% of the selected Heat CFM, 1st stage of Heat ON** Themostat calls for 1st stage Heat W1 ▼...
  • Page 13: Table 2 : Technical Specifications

    Table 2 : Technical Specifications SPECIFICATIONS, SUP ELECTRIC FURNACE WITH ECM MOTOR SUPxx -E230V1 SUPxx -E230V2 RATINGS AND PERFORMANCE Power second stage (Kw) Power first stage (Kw) Net capacity second stage (BTU/h) 51180 61420 68240 78480 92130 Heating temperature rise, second stage heating (F) Heating temperature rise, first stage heating (F) ELECTRICAL SYSTEM Volts - Hertz - Phase...
  • Page 14: Figure 15 : Wiring Diagram (15 Kw)

    Figure 15 : Wiring diagram (15 kW)
  • Page 15: Figure 16 : Wiring Diagram (18 & 20 Kw)

    Figure 16 : Wiring diagram (18 & 20 kW)
  • Page 16: Figure 17 : Wiring Diagram (23 Kw)

    Figure 17 : Wiring diagram (23-25 kW)
  • Page 17: Table 3 : Air Flow (Cfm) - Ecm ½ Hp Motor

    Figure 18 : Wiring diagram (27 kW)
  • Page 18 Table 3 : Electric furnace SUP, ECM ½ HP motor, air flow tables COOLING OR HEAT PUMP HEATING MODE (WITH HP-EFF SELECTED ?) 24 VAC (R) input on G, Y/Y2 and O (for cooling) AC / HP SIZE CFM ? CFM ? CFM ? A/C size...
  • Page 19: Table 4 : Air Flow (Cfm) - Ecm 1.0 Hp Motor

    Table 4 : Electric furnace SUP, ECM 1.0 HP motor, air flow tables COOLING OR HEAT PUMP HEATING MODE (WITH HP-EFF SELECTED ? ) 24 VAC (R) input on G, Y/Y2 and O (for cooling) AC / HP SIZE CFM ? CFM ? CFM ? A/C size...
  • Page 20: E230V1 Or Supxx-E230V2

    Figure 19 : PARTS LIST, Supreme with ECM : SUPxx-E230V1 or SUPxx-E230V2 B50132A.dwg...
  • Page 21: Table 5 : Parts List, Supreme With Ecm

    Table 5 : PARTS LIST, Supreme with ECM : SUPxx-E230V1 or SUPxx-E230V2 ITEM PART # DESCRIPTION COMMENTS B04115-01 HEATING ELEMENT PLATE ASSEMBLY SUP15kw (1/2 HP) Item 12 included B04116-01 HEATING ELEMENT PLATE ASSEMBLY SUP18kw (1/2 HP) Item 12 included B04116-02...

This manual is also suitable for:

Sup18-e230v1Sup20-e230v1Sup23-e230v2Sup27-e230v2

Table of Contents