Hardware
a
S
c
e r
w
M
6
b
S
c
e r
w
M
c
Door handle
d
Wing nut
PREPARATION
--Select an area where you will assemble this product. To protect components,
choose a smooth non abrasive surface that's free of cracks or openings.
--Spread out all parts.
--Tighten all hardware connections by hand first. Before completing each step,
go back and fully tighten all hardware. Be careful not to over- tighten, that could
damage surface or strip threads.
--For best results, complete each in the order presented.
To complete assembly you will need:
(1) Leak detection solution instruction on how to make the solution are included in the
"operating instructions" section of this manual).
(2) Precision-filled LP gas grill tank with Acme Type 1 external threaded valve connection
standard grill size .
Estimated Assembly Time : 30 minutes
Tools Required
1
#2 Philips Head Screwdriver
(Not Included) 1pc
X
1
2
6
X
2
5
Page 9 of 23
2
0
p
s c
p
s c
6
1 set
1 set
Need help?
Do you have a question about the JS-OFT-Z02A and is the answer not in the manual?