Outdoor Unit Electronic Expansion Valve (Eev) - Fujitsu AMUG30LMAS Service Manual

Hide thumbs Also See for AMUG30LMAS:
Table of Contents

Advertisement

4-3. Outdoor unit Electronic Expansion Valve (EEV)

Check point 1. Check connections
Check connection of connector. (Loose connector or open cable)
NOTE: For details of wiring diagram, refer to
AND PARTS LIST on page 02-23.
Check point 2. Check coil of EEV
Remove connector, check each winding resistance of coil.
Read wire
1 (Red) - 2 (Blue)
1 (Red) - 3 (Orange)
1 (Red) - 4 (Yellow)
1 (Red) - 5 (White)
→ If Resistance value is abnormal, replace EEV.
Check point 3. Check Voltage from main PCB
Remove connector and check voltage (DC 12 V)
→ If it does not appear, replace main PCB.
Check point 4. Check noise at start up
Turn on the power and check the operation noise.
→ If an abnormal noise does not show, replace main PCB.
Check point 5. Check Opening and Closing Operation of Valve
When valve is closed, it has a temp. difference
between inlet and outlet
CLOSE
Example : Hot Gas
Pipe (In)
Hi TEMP.
4-3. Outdoor unit Electronic Expansion Valve (EEV)
"Wiring diagrams"
Resistance value
46 Ω ±3.0 Ω at 68°F (20°C)
If it is open, it has no temp. difference between
inlet and outlet
Pipe (Out)
Normal TEMP.
- (03-53) -
in Chapter 2. TECHNICAL DATA
OPEN
Example : Hot Gas
Pipe (In)
Hi TEMP.
Pipe (Out)
Hi TEMP.
4. Service parts information

Advertisement

Table of Contents
loading

This manual is also suitable for:

Amug36lmasAmug48lmasAouh30luah1Aouh36lmah1Aouh48lmah1

Table of Contents