5.2 Assembly SOP
Preparation before assembly
1. Clean the room for work
2. Identify the area for material
3. Prepare the implement, equipment, materials as bellow:
1) Working table
2) Philips-head screwdriver
3) Hex-head screwdriver
4) Gloves
5) Cleaning cloth
6) ESD protection
Assemble "Power board" to "Main
S1
Shielding"
Insert "LVDS FFC" into "Interface
S2
board"
Insert "Power board wire" to "Interface
board"
Assemble "Interface board" to "Main
S3
Shielding"
Lock 5 PCBA screws
(Screw Torque: 9±1 kgf)
Lock 2 hexagonal screws
S4
(Screw Torque: 5.0±0.6 kgf)
Assemble "MYLAR" to "Main Shielding"
S5
- 15 -