SUN2000-(20KTL, 29.9KTL, 30KTL, 36KTL, 40KTL)-
M3
User Manual
5.7.4 (Optional) Connecting the Power Grid Scheduling Signal
Cable
Procedure
Step 1 Connect the signal cable to the signal cable connector.
Figure 5-29 Connecting the cable
Step 2 Connect the signal cable connector to the COM port.
Figure 5-30 Securing the signal cable connector
----End
Issue 18 (2024-03-10)
Copyright © Huawei Technologies Co., Ltd.
5 Electrical Connections
62