Figure 5-23 Installing the cable
Step 2 Connect the signal cable to the COM port.
Figure 5-24 Securing the signal cable connector
----End

5.6.3 Connecting the Power Grid Scheduling Signal Cable

Cable Connection
The following figure shows the cable connections between the inverter and the Ripple Control
Device.
Issue 03 (2019-07-19)
Copyright © Huawei Technologies Co., Ltd.
5 Electrical Connections
50