SUN2000-(3KTL-12KTL)-M0
User Manual
Figure 5-20 Installing the cable
Step 2 Connect the signal cable to the COM port.
Figure 5-21 Securing the signal cable connector
----End
Disconnection
Disconnection can be performed in reverse order.
5.6.3 (Optional) Connecting the Power Grid Scheduling Signal
Cable
Procedure
Step 1 Connect the signal cable to the signal cable connector.
Issue 01 (2018-12-30)
Copyright © Huawei Technologies Co., Ltd.
5 Electrical Connections
45