Spread Half Load; Program Delay - Smeg DC122B Instruction Manual

Table of Contents

Advertisement

SPREAD HALF LOAD

Suitable when there are not many dishes to be washed, it saves energy
and reduces the program duration. Place dishes in both baskets then
load the detergent dispenser than less than the normal amount for a full
load.

PROGRAM DELAY

The PROGRAM DELAY button can be pressed to delay the start of the
washing program by 3,6 or 9 hours, indicated by the PROGRAM
DELAY/PROGRAM PHASES (5) lights. This function allows you to set
the dishwasher to work at your preferred time of day.
After selecting the delay, start the program (see relative section).
The appliance will prewash the dishes, after which the "program delay"
set previously will come into effect (option light and light of selected
program on).N.B.: It is not possible to select the PROGRAM DELAY
option once the cycle has begun.
Remaining program delay time:
with this option active, the user can view the time left before the washing
cycle starts.
press the START/PAUSE button (3); the light of the first phase (5)
of the selected program (4) comes on, while the program light
flashes (confirmation beep);
press the PROGRAM DELAY button. One of the PROGRAM
DELAY lights (5) will flash to indicate whether less than 3, 6, 9 or
12 hours are left before the dishwasher starts.
20
User instructions

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents