Laying The Screed - OBO Bettermann UDHOME2 Mounting Instructions

Floor socket with tube body
Hide thumbs Also See for UDHOME2:
Table of Contents

Advertisement

Laying the screed

Note!
7
ATTENTION
Note!
14 | EN
undershot. (Hmin2: 110 mm)
If screed laying follows, then insert the mounting support loosely into the
floor socket for storage.
Abb. 11: Inserting installation pipes
8. Insert the installation pipe flush into the empty pipe entry
them outside on the floor.
Laying the screed
Risk of damage from screed!
The ingress of screed into the floor socket can lead to product damage!
Before screed laying, protect the floor socket with the mounting cover.
Before screed work, apply a suitable separating layer to the housing
of the floor socket, in order to reduce noise transmission and to avoid
screed adhesion to the housing.
6
and fix
OBO Bettermann

Advertisement

Table of Contents
loading

This manual is also suitable for:

7368409

Table of Contents