Table Of Contents - Siemens NTWRK-ENCL Installation Instructions Manual

Network enclosure
Table of Contents

Advertisement

Network Enclosure Installation Instructions

Table of Contents

1.
INTRODUCTION ................................................................................................................. 4
2.
INSTALLATION .................................................................................................................. 5
2.1
Mounting the Enclosure ..................................................................................................... 5
2.2
Installing the PAD-4, Power Supply, and Battery ................................................................ 6
2.3
Scalance XC206-2SFP-MM/-SM Network Switch Installation ............................................. 7
2.4
Configuration of the Scalance XC206-2SFP-MM/-SM ........................................................ 7
3.
WIRING ............................................................................................................................... 8
3.1
Enclosure Knockouts ......................................................................................................... 8
3.2
Fiber Optic Connection ...................................................................................................... 8
3.3
Power and Battery Connection to the PAD-4 ...................................................................... 8
3.4
Power Connections to the Scalance XC206-2SFP-MM/-SM ............................................... 9
4.
CONFIGURATION............................................................................................................. 10
4.1
Configuration of the PAD-4 .............................................................................................. 10
4.2
Configuration of the Scalance XC206-2SFP-MM/-SM ...................................................... 10
5.
SUPERVISION .................................................................................................................. 11
5.1
Supervision of the Scalance XC206-2SFP-MM/-SM ......................................................... 11
5.2
Supervision of the PAD-4 and Battery .............................................................................. 11
Siemens Industry, Inc.
Smart Infrastructure
2
A6V12412370_en--_a

Advertisement

Table of Contents
loading

This manual is also suitable for:

S54465-c85-a1S54465-c84-a1

Table of Contents