Specifications; Assembly Procedures - Hitachi Koki RB 24EAP Safety Instructions And Instruction Manual

Hide thumbs Also See for RB 24EAP:
Table of Contents

Advertisement

Available languages

Available languages

English

SPECIFICATIONS

Engine Size (cu. in.)
Spark Plug
Dry Weight (Ibs)
Fuel Tank Capacity (fl . oz)
Sound pressure level
LpA (dB (A))
by ISO22868
Uncertainty (dB (A))
Sound power level
Lw measured (dB (A))
by ISO22868
Sound power level LwA (dB (A))
by 2000/14/EC
Vibration level (m/s
2
by ISO22867
Uncertainty (m/s
)
2
*1: Equivalent noise level/vibration level are calculated as the time-weighted energy total for noise/vibration
levels under various working conditions with the following time distribution: 1/7 Idle, 6/7 racing.
*2: ANSI B175.2
* All data subject to change without notice.

ASSEMBLY PROCEDURES

Blow pipes to main body (Fig. 1)
Inspect the main body and accessories.
Connect straight pipe (1) securely. Align projection
(2) in straight pipe with groove (3) on blower housing
and slide the pipe into the blower housing.
Rotate the pipe clockwise to lock it into place.
1
6
MODEL
)
3
2
Fig. 1
RB24EAP
1.46 (23.9 ml)
Champion CJ6
8.6 (3.9 kg)
17.6 (0.52 l)
By ANSI 69*
By CEN 87*
1.8*
107*
109*
12
1.0
Conic pipe to straight pipe (Fig. 2)
○ Align groove (5) on the conic pipe (6) and
projection (4) on straight pipe (1) and rotate the
conic pipe in place.
5
6
2
1
1
1
1
4
1
Fig. 2

Advertisement

Table of Contents
loading

Table of Contents