UIM-10/100
Installation Instructions
Document Number UIM1-A2-GZ40-00
August 2005
Contents
Unpacking the Equipment
Unpack and inspect the equipment. The following components should be included:
If there is visible damage, do not attempt to connect the device; contact your sales
representative.
UIM1-A2-GZ40-00
.................................................................................................. 5
....................................................................................................... 6
HANDLING PRECAUTIONS FOR
!
STATIC-SENSITIVE DEVICES
This product is designed to protect sensitive components from damage
due to electrostatic discharge (ESD) during normal operation. When
performing installation procedures, however, take proper static control
precautions to prevent damage to equipment. If you are not sure of the
proper static control precautions, contact your nearest sales or service
representative.
1 UIM-10/100 Uplink Interface Module
4 #6 Phillips Panhead Internal Locking Screws
2 #6 Phillips Flathead Screws
August 2005
.................................................................................. 1
............................................................................. 2
................................................................... 3
................................................................ 4
....................................................................... 4
.......................................................................... 5
........................................... 5
1