Download Print this page

Huawei PDC-0091V2ACIOA Quick Installation Manual page 18

Advertisement

Connecting cables to the PDU for a 1+1 UPS2000-G-15 kVA/20 kVA parallel system (Three-phase input single-phase
output and Two Mains Input)
 Torque for tightening power cables
Device
UPS2000-G-15 kVA
UPS2000-G-20 kVA
PDU
 Cable list
1. The table lists only the cables directly connected to the PDU. For details about other cables and cable types, see
the quick installation guides for related devices.
2. Configure colors for the cables prepared onsite in accordance with the local regulations.
3. If customers purchase input and output power cables by themselves, use the cables that comply with standards
proposed by Underwriters Laboratories (UL) or International Electrotechnical Commission (IEC).
No.
Item
PDU AC
1
output power
cable
PDU bypass
2
input power
cable
PDU mains
3
input power
cable
PDU UPS 1
4
mains input
power cable
PDU UPS2
5
mains input
power cable
PDU UPS 1
6
bypass input
power cable
PDU UPS2
7
bypass input
power cable
PDU UPS1
8
output power
cable
PDU UPS2
9
output power
cable
Tool
Torque
screwdriver
Appearance
17
Screw
Torque
M5 x 0.8p
1.5 N· m
M5 x 0.8p
1.5 N· m
M5 x 0.8p
1.5 N· m
Specifications
16 mm² (1+1
UPS2000-G-15
kVA/20 kVA parallel
system)
16 mm² (1+1
UPS2000-G-15
kVA/20 kVA parallel
system)
6 mm² (1+1
UPS2000-G-15
kVA/20 kVA parallel
system)
N/A
N/A
N/A
N/A
N/A
N/A
Remarks
Prepared onsite
Prepared onsite
Prepared onsite
The cables is
delivered with
PDU, with a part
number of
04090677.

Advertisement

loading

This manual is also suitable for:

V100r001