Download Print this page

Huawei PDC-0091V2ACIOA Quick Installation Manual page 16

Advertisement

Connecting cables to the PDU for a 1+1 UPS2000-G-15 kVA/20 kVA parallel system (Three-phase input single-phase
output and One Mains Input)
 Torque for tightening power cables
Device
UPS2000-G-15 kVA
UPS2000-G-20 kVA
PDU
 Cable list
1. The table lists only the cables directly connected to the PDU. For details about other cables and cable types, see
the quick installation guides for related devices.
2. Configure colors for the cables prepared onsite in accordance with the local regulations.
3. If customers purchase input and output power cables by themselves, use the cables that comply with standards
proposed by Underwriters Laboratories (UL) or International Electrotechnical Commission (IEC).
No.
Item
PDU AC
1
output power
cable
PDU bypass
input power
cable
2
PDU mains
input power
cable
PDU UPS 1
bypass input
power cable
3
PDU UPS 1
mains input
power cable
PDU UPS1
4
output power
cable
PDU UPS2
bypass input
power cable
5
PDU UPS2
mains input
power cable
PDU UPS2
6
output power
cable
Tool
Torque
screwdriver
Appearance
15
Screw
Torque
M5 x 0.8p
1.5 N· m
M5 x 0.8p
1.5 N· m
M5 x 0.8p
1.5 N· m
Specifications
16 mm² (1+1
UPS2000-G-15
kVA/20 kVA parallel
system)
16 mm² (1+1
UPS2000-G-15
kVA/20 kVA parallel
system)
6 mm² (1+1
UPS2000-G-15
kVA/20 kVA parallel
system)
N/A
N/A
N/A
N/A
N/A
N/A
Remarks
Prepared
onsite
Prepared
onsite
The cables is
delivered with
PDU, with a
part number
of 04090677.

Advertisement

loading

This manual is also suitable for:

V100r001