Section 10. Maintenance Logbook - Faraone E5 ES Use And Maintenance Instructions

Aerial platform
Table of Contents

Advertisement

OPERATOR: ___________________
DATE:
__________________
Quarterly
Check there is no backlash, mechanical parts not correctly secured and/or bent
and no damaged welds on parts/components
Check the integrity of the structural profiles
Check correct operation of the emergency descent valve
Check the hydraulic oil level
Check the hydraulic oil pipes and make sure there are no leaks
Battery Inspection
Check the cage and entrance doors
Check the controls
Check the wheels for wear
Every six months
Perform "QUARTERLY MAINTENANCE"
Transmission motor: Check the brushes for wear.
Transmission motor: Check the manifold.
Transmission motor: Check the bearings.
Transmission motor: Check the electromagnet (brake).
Check the column sliding pads
Every two years
Perform "QUARTERLY AND SIX-MONTHLY MAINTENANCE"
Hydraulic oil change
Date: _______________
NOTES
AERIAL PLATFORM E5 ES – Rev. 00_2020

SECTION 10. MAINTENANCE LOGBOOK

MAINTENANCE
USE AND MAINTENANCE MANUAL – SECTION 10
Signature: ________________
DONE
Page 10-1

Advertisement

Table of Contents
loading

Table of Contents