Quick Start Procedure - Paradyne 3170 Quick Reference

Zhone acculink 3170 dsu-csu combo: reference guide
Table of Contents

Advertisement

Quick Start Procedure

The following procedure is for experienced DSU/CSU users who are familiar with the
317x DSU/CSU installation process and have no special requirements for their
application. See the ACCULINK 317x E1 Data Service Unit/Channel Service Unit
Operator's Guide for more information.
1. 317x DSU/CSUs are shipped with a power cable appropriate to the country of
installation. Attach the power module cord to the rear of the DSU/CSU and the
other end to a grounded ac power outlet. If you intend instead to use a 24 or
–48 vdc power supply, see the Operator's Guide.
2. Attach the 317x DSU/CSU network connection to the E1 network using the
appropriate cable. Attach the 317x DSU/CSU to the customer premises equipment
via the DTE and port connectors.
3. If you intend to use front panel emulation, connect the cable from the PC to the
COM port on the rear panel of the DSU/CSU.
4. Power on the DSU/CSU to perform the power-up self-test.
5. During the power-up self-test, the FAIL LED flashes, then all LEDs blink twice.
When the test is complete, verify that the DSU/CSU is functional by observing that
the OK, NETWORK SIG, and DTE SIG LEDs are lit.
6. If you intend to manage the 317x DSU/CSU with SNMP, cable either the COM or
AUX port (as appropriate for your configuration). Then, configure the SNMP
management link.
7. If you do not intend to use the DTE Drop/Insert E1 port, disable it using the
configuration procedures in Chapter 3, Operation , and Appendix C, Configuration
Options , of the Operator's Guide. (The default setting for this port is Enabled.)
8. Configure the ports and channels you intend to use and assign channels to the
network interface.
2

Advertisement

Table of Contents
loading

Table of Contents