Responder; Loading The Stand-Alone Link Test Program - IBM 3725 Manual

Communication controller stand-alone link tests
Table of Contents

Advertisement

(
(
·(
·(
(
{
Responder
I
WARNING!
Loading the Link Test program destroys the control program.
Loading the Stand-Alone Link Test Program
1. Disable all channel ports and power up the 3725 if not already done.
2. Perform a MOSS IML from the control panel. When MOSS IML is complete,
the primary menu is displayed (refer to Chapter 4 of the Operating Guide).
3. Define the intermediate network node (INN) link as an IPL Port in the IPL
Port table.
4. Enter 'I' followed by SEND to select IPL CCU /TSS. The following screen is
displayed:
Machine Status Area
l : IPL CCUITSS
G: GCF /IPL PORTS
L : LI NE FNCTN
C: CNTRL PGM PROC
E:ERROR LOG
M:MAINTENANCE
. I ONE SCANNER I ML .
. 2 3725 IPL'
. 3 LINK TEST REQ'
. 4 LINK TEST RESP'
SP:CCU STOP
Q:OATE/TIME'
sT:ccu START
T:TERMINATE'
RS: CCU RESET'
Chapter 2. Link Test.Function Procedure
2-11

Advertisement

Table of Contents
loading

Table of Contents