Trane S8B1A040M3PSCA/C Installation, Operation And Maintenance Manual page 26

Upflow/downflow/horizontal gas-fired, 1–stage and 2–stage induced draft furnaces with high efficiency motor
Table of Contents

Advertisement

F F u u r r n n a a c c e e G G e e n n e e r r a a l l I I n n s s t t a a l l l l a a t t i i o o n n
The furnace is shipped standard for left side installation of gas piping.
A cutout with plug is provided on the right side for an alternate gas
piping arrangement.
The installation of piping shall be in accordance with piping codes and
the regulations of the local gas company. Pipe joint compound must be
resistant to the chemical reaction with liquefied petroleum gases.
Important: If local codes allow the use of flexible gas appliance
connector, always use a new listed connector. Do not use
a connector which has previously serviced another gas
appliance.
Refer to the piping table for delivery sizes. Connect gas supply to the
unit, using a ground joint union and a manual shut-off valve. National
codes require a condensation drip leg to be installed ahead of the gas
valve.
The furnace and its individual shut-off valve must be disconnected
from the gas supply piping system during any pressure testing of that
system at test pressures in excess of 1/2 psig (3.5 kPa).
The furnace must be isolated from the gas supply piping by closing its
individual manual shut-off valve during any pressure testing of the
gas supply piping system at test pressures equal to or less than 1/2
psig (3.5 kPa).
Note: Maximum pressure to the gas valve for natural gas is 13.8" W.
C. Minimum pressure is 5.0" W.C. Maximum pressure to the
gas valve for propane is 13.8" W.C. Minimum pressure is 11.0"
W.C.
All gas fittings must be checked for leaks using a soapy solution before
lighting the furnace. DO NOT CHECK WITH AN OPEN FLAME!
For propane conversions use S-Series Furnaces, use BAYLPSS400*
conversion kit with stainless steel burners.
26
NATURAL GAS ONLY
TABLE OF CUBIC FEET PER HOUR OF GAS
FOR VARIOUS PIPE SIZES AND LENGTHS
PIPE
LENGTH OF PIPE
SIZE
10
20
30
1/2
131
90
72
3/4
273
188
151
1
514
353
284
1–1/4
1060
726
583
This table is based on Pressure Drop of 0.3 inch W.C. and 0.6 SP.
GR. Gas
ORIFICE SIZES
INPUT
NUMBER OF
RATING
BURNERS
BTUH
40,000
2
60,000
3
80,000
4
100,000
5
120,000
6
40
50
60
70
62
55
50
46
129
114
104
95
243
215
195
179
499
442
400
368
MAIN BURNER ORIFICE
DRILL SIZE
NAT. GAS
PROPANE
GAS
45
56
45
56
45
56
45
56
45
56
S8XB-SVX001-1C-EN

Advertisement

Table of Contents
loading

Table of Contents