Acceleration / Deceleration Rate When Starting / Stopping Compressors; Standard Iplv Capacity Control; Figure 120 - Minimum Vsd Run Frequency - York YCIV0157 Installation Operation & Maintenance

Air-cooled screw liquid chillers
Table of Contents

Advertisement

Form 201.23-NM2
Issue date: 12/19/2023
• If the ambient is between 110 and 125°F (43 and
52°C), the Minimum VSD Run Frequency is
scaled according to the following formula:
(3 x Ambient Temperature) - 280°F (-173°C)..
The formula is also represented by the graph in Figure
120 on page 205.
100
95
90
85
80
75
70
65
60
55
50
45
40
105
110
115
Ambient Temperature (°F)
NOTE: The graph above also illustrates the scaled frequency:

Figure 120 - Minimum VSD run frequency

• If the ambient temperature is more than 125°F
(51.7°C), the Minimum VSD Run Frequency will
be 95 Hz.
Acceleration / deceleration rate when
starting / stopping compressors
Vsd acceleration and deceleration rates
The acceleration rate changes with frequency and fol-
lows the guidelines below:
• Between 0 Hz and 50 Hz, the acceleration is 10
Hz/s.
• Between 50 Hz and 200 Hz, the acceleration is
30.4 Hz/s. Even though the acceleration rate of
30.4 Hz/s is possible up to 200 Hz, the frequency
(speed) is limited by the minimum start frequency
and the add a compressor frequency calculation
performed by the microprocessor when bringing
on an additional compressor.
When decelerating, the deceleration rate changes with
frequency and follows the guidelines below:
• Between 200 Hz and 100 Hz, the deceleration
time is 30.4 Hz/s.
• Between 100 Hz and 0 Hz, the deceleration time
is 10 Hz/s.
Johnson Controls
120
125
130
LD10628
When a compressor stops, back-spin of the compres-
sor will often occur as the pressure differential between
discharge and suction equalizes. This should not be a
cause of concern.

Standard IPLV capacity control

(Loading/Unloading and starting additional compressors)
Standard IPLV Capacity Control is installed in the
chiller at the factory using a dedicated EPROM (soft-
ware), part # 031-02476-001, for "Standard Only"
IPLV control. If the LCHLT is more than the pro-
grammed Setpoint plus CR, only a single compressor
is permitted to start under Standard IPLV control. The
compressor will start at the minimum start frequency
based on ambient temperature. The lead compressor
Feed and Drain Valves will immediately begin to con-
trol superheat and liquid level in the flash tank.
When a compressor starts, the load and unload timers
will be set to 30 seconds. During the first 30 seconds
of operation after a compressor reaches the start fre-
quency, loading/unloading is inhibited.
After 30 seconds, the control logic looks at the LCHLT
temp, compares it to the Setpoint plus CR, and makes
decisions to load or unload.
For precise capacity control, the Chiller Control Board
microprocessor loads and unloads compressors quick-
ly, as fast as every 2 seconds, in increments of 0.1 to
1 Hz each time a load or unload change is required.
Fixed load and unload timers of 2 sec. are set, after a
speed change of 0.11 to 1 Hz, to minimize undershoot
and overshoot.
As additional cooling is required (LCHLT more than
Setpoint plus CR), the Chiller Control Board micro-
processor will increase the speed of the compressor at
the rate of 0.1 Hz to 1 Hz every 2 seconds until the load
is satisfied. Loading will continue to occur as long as
leaving chilled liquid temperature is above the Setpoint
plus CR.
If the temperature falls very near or within the Control
Range, the Chiller Control Board microprocessor will
make decisions regarding speed changes under condi-
tions where the "error" and "rate" conflict. Under these
conditions, loading/unloading follows the guidelines
described in the Fuzzy logic control on page 209.
If the compressor speed exceeds the maximum
Section 7 - Operation