Tdh Unit Setup - AEC TrueTemp Series Operation And Installation Manual

Toh hot oil temperature control unit
Hide thumbs Also See for TrueTemp Series:
Table of Contents

Advertisement

AEC/Appllcatlon Engineering
3
TDH Unit Setup
Connections are labeled appropriately on the back of each unit:
Connect the DELIVERY hookup to the entrance of the process and the RETURN hookup to
the exit of the process.
Connect the WATER SUPPLY to your chiller tower water or central water supply.
Connect the WATER DRAIN line to an open drain or to the RETURN line of your chiller
tower water or central water system.
Caution!
If the drain line is flowing to an open drain,
direct it away from personnel
to prevent scalding .
Caution!
---ltn\.IRNVAL'la
The connecting lines and connectors between the temperature control unit
and the process should be carefully selected by the user
to
suit the needs and requirements of the application.
The lines and connectors should have a service rating of at least 100 psig,
and a temperature rating at least equal to the maximum temperature
attainable by your unit (consult unit nameplate) .
TOH TrueTemp™ Serles Hot 011 Temperature Control Units
Page 27

Advertisement

Table of Contents
loading

Table of Contents