5 Electrical Connections
5 Electrical Connections
5.2

AC Connection

5.2.1 AC cable connection
1. Measure and access the voltage and frequency of the point to ensure that it meets the grid-tied
specifications of the inverter.
2. PE wire(GND) must be well grounded to ensure that impedance between Neutral wire and Earth wire
be less than 10Ω.
3. Disconnect the circuit breaker or fuse from the inverter and grid-connected access point.
4. Use the copper wire.
5. Follow these steps.
100mm(Recommended)
A
B
1
Select proper AC cables and OT terminals (5 wires).
Unscrew the nut of the cover and thread the AC cable (5 wires) cross the nut, threaded sleeve and the
the cover. Then crimp the OT terminal and use heat shrink tubing or insulation tape for protection.
2
Wires threading and pressing.
(Only take PV 25KTL-D3/G2 model as an example)
3
Lock the AC cable to the corresponding AC terminals.
The RCD used on the main solar supply circuit should be Type A 100mA. This and all associated wiring
must be installed in accordance with AS /NZS 4777.1
L+2mm
L
No. Name
Model
A Wire outer diameter(mm)
Range
B Cross-sectional
area(mm²)
Recommended 6
Note: It is recommended to use outdoor dedicate cables with multiple
copper cores.
Heat shrinkable tube
D
L1 L2 L3 N PE
14 15
5K-15K 17K-20K 22K-25K
11-18
24-32
4-6
6-16
10
Screw Torque
5K-15K
M4
1.2N·m
17K-25K
M5
2N·m
24-32
10-16
16
D
10mm
12.5mm

Advertisement