Unpacking and Storage

3.1

Unpacking and Check

Complete test and strict inspection before the inverter is sent out.
When receiving the inverter, check that the packing materials are intact.
After unpacking, examine the PV inverter and its fittings for damage and check that the deliverables
are complete.
A
F
Number
A
B
C
D
E
F
G
H
I
J
NOTICE
B
H
G
Description
The Inverter
Bracket
AC shield (4xM4 security screws)
PV connectors
File package
Expansion screws
M6 Security screw
6-Pin terminal
Remove tool for PV connector
RS485 cover
Contact your dealer immediately, if there is any issue found during operation.
C
Or
I
J
groups
06
3 Unpacking and Storage
3 Unpacking and Storage
D
E
Quantity
1
1
1
2 or 4
1
3
2
2
1 (Optional)
1

Advertisement

Table of Contents
loading

Table of Contents