5 List of abbreviations:
O.K
Upper edge of playing level
G
Drainage layer
T.anh.
Lifting trampoline to install or clean!
Installation
The trampoline has to be put equaly on the drainage.
Cleaning:
When lifting or lowering the trampoline pay attention that it
is equaly lifted on all 4 outer corners!
The Trampoline must be installed evenlly onto the founda-
tion.
TF !
Parting line max. 0,5 - 1 cm around the trampoline
To prevent soiling in the parting line please follow this
instruction:
Styrofo-
Place 1 cm thick styrofoam in the area around the trampo-
am
line (max. height oft he styrofoam ist the lower edge of out-
er rubber surfacing on top of the trampoline!)
Sand
Fill the parting line/joint with sand or granulate!
(view diagram)
(granules)
See drawings for details of shortcut