List Of Abbreviations - Hally-Gally Piccolo Assembly Instructions Manual

Playground trampoline
Hide thumbs Also See for Piccolo:
Table of Contents

Advertisement

Available languages

Available languages

5 List of abbreviations:

O.K
Upper edge of playing level
G
Drainage layer
T.anh.
Lifting trampoline to install or clean!
Installation
The trampoline has to be put equaly on the drainage.
Cleaning:
When lifting or lowering the trampoline pay attention that it
is equaly lifted on all 4 outer corners!
The Trampoline must be installed evenlly onto the founda-
tion.
TF !
Parting line max. 0,5 - 1 cm around the trampoline
To prevent soiling in the parting line please follow this
instruction:
Styrofo-
Place 1 cm thick styrofoam in the area around the trampo-
am
line (max. height oft he styrofoam ist the lower edge of out-
er rubber surfacing on top of the trampoline!)
Sand
Fill the parting line/joint with sand or granulate!
(view diagram)
(granules)
See drawings for details of shortcut
SPOGG Sport-Güter GmbH • Schulstr. 27 • 35614 Aßlar/Berghausen
• www.hally-gally-spielplatzgeraete.de
spogg@hally-gally-spielplatzgeraete.de
:
10

Advertisement

Chapters

Table of Contents
loading

Related Products for Hally-Gally Piccolo

This manual is also suitable for:

2265605

Table of Contents