Advertisement

Quick Links

Operator: _____________________________________________________
Location: ______________________________________________________
Y:\Mont-anv-2010\Trampolin Circus_002 (2).doc
SPOGG Sport-Güter GmbH • Schulstr. 27 • 35614 Aßlar/Berghausen
spogg@hally-gally-spielplatzgeraete.de
• www.hally-gally-spielplatzgeraete.de
A Assembly instructions
Trampoline Circus
Art.# 20.02.112
- 1 -

Advertisement

Table of Contents
loading

Summary of Contents for Hally-Gally 20.02.112

  • Page 1: A Assembly Instructions Trampoline Circus Art.# 20.02.112

    SPOGG Sport-Güter GmbH • Schulstr. 27 • 35614 Aßlar/Berghausen spogg@hally-gally-spielplatzgeraete.de • www.hally-gally-spielplatzgeraete.de A Assembly instructions Trampoline Circus Art.# 20.02.112 Operator: _____________________________________________________ Location: ______________________________________________________ Y:\Mont-anv-2010\Trampolin Circus_002 (2).doc - 1 -...
  • Page 2 SPOGG Sport-Güter GmbH • Schulstr. 27 • 35614 Aßlar/Berghausen spogg@hally-gally-spielplatzgeraete.de • www.hally-gally-spielplatzgeraete.de Revision history Revision 0 – 2010-06-18 The first allowed version Assembly instructions JF Revision 2 – 2013-09-02 Achtung Trennfuge FH All rights reserved © Copyright 2010 Spogg Sport-Güter GmbH...
  • Page 3: Table Of Contents

    Datasheet Climbing Trampoline Circus, Art.# 20.02.112 ............6 Delivery contents (parts list with part numbers) .................7 Post installation checks ......................15 Maintenance instructions Trampoline Circus Art.# 20.02.112 ..........17 Introduction Maintenance ......................19 General maintenance information ....................20 Maintenance timetable ........................ 22 Monthly maintenance ........................
  • Page 4: Introduction Assembling

    SPOGG Sport-Güter GmbH • Schulstr. 27 • 35614 Aßlar/Berghausen spogg@hally-gally-spielplatzgeraete.de • www.hally-gally-spielplatzgeraete.de 1 Introduction Assembling General information This equipment should be installed, inspected, maintained and operated in accordance with EN1176-7 guidelines. Before installation work commences, please check that you have all of the equipment and fixation components in the parts list provided (see Tables 3-1 and 3-2).
  • Page 5 SPOGG Sport-Güter GmbH • Schulstr. 27 • 35614 Aßlar/Berghausen spogg@hally-gally-spielplatzgeraete.de • www.hally-gally-spielplatzgeraete.de Drawings / Views All optical drawings are showing only the measurements/dimensions and are no mandatory technical views of the complete item. We reserve the right to change technical details of our articles which are serving for the further development of our articles and are reasonable for the customer.
  • Page 6: Datasheet Climbing Trampoline Circus, Art.# 20.02.112

    SPOGG Sport-Güter GmbH • Schulstr. 27 • 35614 Aßlar/Berghausen spogg@hally-gally-spielplatzgeraete.de • www.hally-gally-spielplatzgeraete.de Datasheet Climbing Trampoline Circus, Art.# 20.02.112 Space requirement: Ø 1.90 m and/or Ø 4.30 m including safety zone. The Images (individual drawings) are not to scale !! Required safety surface:...
  • Page 7: Delivery Contents (Parts List With Part Numbers)

    SPOGG Sport-Güter GmbH • Schulstr. 27 • 35614 Aßlar/Berghausen spogg@hally-gally-spielplatzgeraete.de • www.hally-gally-spielplatzgeraete.de Delivery contents (parts list with part numbers) In words Table 3-1: Delivery contents, in words Pos. Quantity Element / Size Missing Description Round trampoline Ø 1.90m Foundation ring Ø...
  • Page 8: Table 3-2: Delivery Contents, In Symbols

    SPOGG Sport-Güter GmbH • Schulstr. 27 • 35614 Aßlar/Berghausen spogg@hally-gally-spielplatzgeraete.de • www.hally-gally-spielplatzgeraete.de Table 3-2: Delivery contents, in symbols Pos. Quantity Symbol Ø 1,90 m M10 x 12 mm Y:\Mont-anv-2010\Trampolin Circus_002 (2).doc...
  • Page 9 SPOGG Sport-Güter GmbH • Schulstr. 27 • 35614 Aßlar/Berghausen spogg@hally-gally-spielplatzgeraete.de • www.hally-gally-spielplatzgeraete.de Y:\Mont-anv-2010\Trampolin Circus_002 (2).doc - 9 -...
  • Page 10 SPOGG Sport-Güter GmbH • Schulstr. 27 • 35614 Aßlar/Berghausen spogg@hally-gally-spielplatzgeraete.de • www.hally-gally-spielplatzgeraete.de Y:\Mont-anv-2010\Trampolin Circus_002 (2).doc...
  • Page 11 SPOGG Sport-Güter GmbH • Schulstr. 27 • 35614 Aßlar/Berghausen spogg@hally-gally-spielplatzgeraete.de • www.hally-gally-spielplatzgeraete.de Y:\Mont-anv-2010\Trampolin Circus_002 (2).doc - 11 -...
  • Page 12 SPOGG Sport-Güter GmbH • Schulstr. 27 • 35614 Aßlar/Berghausen spogg@hally-gally-spielplatzgeraete.de • www.hally-gally-spielplatzgeraete.de Y:\Mont-anv-2010\Trampolin Circus_002 (2).doc...
  • Page 13 SPOGG Sport-Güter GmbH • Schulstr. 27 • 35614 Aßlar/Berghausen spogg@hally-gally-spielplatzgeraete.de • www.hally-gally-spielplatzgeraete.de Attention! The split line of 10mm is required to keep the trampoline removeable for maintenance work. Y:\Mont-anv-2010\Trampolin Circus_002 (2).doc - 13 -...
  • Page 14 SPOGG Sport-Güter GmbH • Schulstr. 27 • 35614 Aßlar/Berghausen spogg@hally-gally-spielplatzgeraete.de • www.hally-gally-spielplatzgeraete.de A.z.Ar. To allow for working space – pit Ø 2,40 m Drainage layer O.K. Top ground level Place requirement In case of using wetpour, the cleaning of the outer gaps is mandatory.
  • Page 15: Post Installation Checks

    SPOGG Sport-Güter GmbH • Schulstr. 27 • 35614 Aßlar/Berghausen spogg@hally-gally-spielplatzgeraete.de • www.hally-gally-spielplatzgeraete.de Post installation checks If the equipment has not been installed safely, you must ensure that the public is prevented from using it. Marking filler depth • Labelling the posts to show the depth of material provided as fall protection (i.e.
  • Page 17: B Maintenance Instructions Trampoline Circus Art.# 20.02.112

    SPOGG Sport-Güter GmbH • Schulstr. 27 • 35614 Aßlar/Berghausen spogg@hally-gally-spielplatzgeraete.de • www.hally-gally-spielplatzgeraete.de B Maintenance instructions Trampoline Circus Art.# 20.02.112 Y:\Mont-anv-2010\Trampolin Circus_002 (2).doc - 17 -...
  • Page 18 SPOGG Sport-Güter GmbH • Schulstr. 27 • 35614 Aßlar/Berghausen spogg@hally-gally-spielplatzgeraete.de • www.hally-gally- spielplatzgeraete.de Revision history Revision 0 – 2010-06-18 The first allowed version Maiantanance instructions JF Revision 2 – 2013-09-02 Achtung! Trennfuge FH All rights reserved © Copyright 2010 Spogg Sport-Güter GmbH...
  • Page 19: Introduction Maintenance

    SPOGG Sport-Güter GmbH • Schulstr. 27 • 35614 Aßlar/Berghausen spogg@hally-gally-spielplatzgeraete.de • www.hally-gally-spielplatzgeraete.de Introduction Maintenance General informations This equipment should be installed, inspected, maintained and operated in accordance with EN 1176-7 guidelines. Please note: Providing any necessary repairs are carried out, a piece of play equipment that is inspected regularly cannot become so damaged that it is dangerous.
  • Page 20: General Maintenance Information

    SPOGG Sport-Güter GmbH • Schulstr. 27 • 35614 Aßlar/Berghausen spogg@hally-gally-spielplatzgeraete.de • www.hally-gally- spielplatzgeraete.de General maintenance information Maintenance intervals Maintenance intervals are based on average use. Please note that more frequent inspections and/or maintenance are required if the play equipment is subject to intensive use.
  • Page 21 SPOGG Sport-Güter GmbH • Schulstr. 27 • 35614 Aßlar/Berghausen spogg@hally-gally-spielplatzgeraete.de • www.hally-gally-spielplatzgeraete.de Faults Damages must be repaired as soon as they are detected. If serious defects that affect the safetyness cannot be repaired straight away, the playground item must be blocked with immediate effect.
  • Page 22: Maintenance Timetable

    SPOGG Sport-Güter GmbH • Schulstr. 27 • 35614 Aßlar/Berghausen spogg@hally-gally-spielplatzgeraete.de • www.hally-gally- spielplatzgeraete.de Maintenance timetable Special advices 7.1.1 Maintenance interval We strongly advise you to carry out inspections and maintenance work within the specified periods as use of the equipment, the weather and malicious vandalism cause wear and tear that compromises the safety and function of the equipment.
  • Page 23: Monthly Maintenance

    SPOGG Sport-Güter GmbH • Schulstr. 27 • 35614 Aßlar/Berghausen spogg@hally-gally-spielplatzgeraete.de • www.hally-gally-spielplatzgeraete.de Monthly maintenance Check the spaces between the equipment and the ground (clearance and height of fall). Check the ground surface of fall protection for hard objects and loose foundations.
  • Page 24 SPOGG Sport-Güter GmbH • Schulstr. 27 • 35614 Aßlar/Berghausen spogg@hally-gally-spielplatzgeraete.de • www.hally-gally- spielplatzgeraete.de repairs have been carried out or additional system components have been installed or replaced. Y:\Mont-anv-2010\Trampolin Circus_002 (2).doc...
  • Page 25: Annual Maintenance

    SPOGG Sport-Güter GmbH • Schulstr. 27 • 35614 Aßlar/Berghausen spogg@hally-gally-spielplatzgeraete.de • www.hally-gally-spielplatzgeraete.de Annual Maintenance Annual maintenance 11.1 Ascertaining that the equipment, foundations and surfaces are safe for operation. 11.2 In particular, the equipment should be checked for decay and corrosion.
  • Page 26: Maintenance Printout

    SPOGG Sport-Güter GmbH • Schulstr. 27 • 35614 Aßlar/Berghausen spogg@hally-gally-spielplatzgeraete.de • www.hally-gally- spielplatzgeraete.de 12 Maintenance printout Name of item: Climbing Game – Trampoline Circus __ / Art. No. 20.02.112 ____________________________________ Location: _______________________________________________________________________________________ Customer or operator: _____________________________________________________________________________ (Town, Town council, Kindergarten) Date of Inspector O.K.
  • Page 28: Hand Over Document

    SPOGG Sport-Güter GmbH • Schulstr. 27 • 35614 Aßlar/Berghausen spogg@hally-gally-spielplatzgeraete.de • www.hally-gally- spielplatzgeraete.de 13 Hand over document After the installation of the equipment pass the installation and maintenance documents to the operator. The operator has to receive the hand over documents. The complete filled and signed hand over document should be sent to the supplier.

Table of Contents