Page 3
1BTCGL14 KIT 1BTCGL14 INSTALLED ON DOUBLE GRIP-LOCK LADDER RACK 1BTCGL14 CENTER BOW KIT FOR 2014 FORD TRANSIT CONNECT RACKS ADRIAN STEEL COMPANY WWW.ADRIANSTEEL.COM 906 JAMES STREET ADRIAN, MI 49221 800-677-2726 46081 16922 Publication Number: Revision Level: ECN Release:...
Page 4
MEASURING TAPE STOP AND/OR WRENCHES ADDITIONAL TOOLS MAY BE NEEDED FOR THIS INSTALLATION AND THEY WILL BE IDENTIFIED IN THE STEPS THAT FOLLOW. ADRIAN STEEL COMPANY WWW.ADRIANSTEEL.COM 906 JAMES STREET ADRIAN, MI 49221 800-677-2726 46081 16922 Publication Number: Revision Level:...
Page 5
1BTCGL14 CENTER BOW KIT Assembly Instructions BAG1BTCG14 FASTENER BAG FOR 1BTCGL14 CENTER BOW KIT ADRIAN STEEL COMPANY WWW.ADRIANSTEEL.COM 906 JAMES STREET ADRIAN, MI 49221 800-677-2726 46081 16922 Publication Number: Revision Level: ECN Release:...
Page 6
1 PER SIDE TORQUE TO 10 FT LBS NOTE: IF A 4” CONDUIT KIT IS USED, 45252 WEAR INSERT MUST BE CUT DOWN TO TWO 22” PIECES ADRIAN STEEL COMPANY WWW.ADRIANSTEEL.COM 906 JAMES STREET ADRIAN, MI 49221 800-677-2726 46081 16922 Publication Number:...
Need help?
Do you have a question about the 1BTCGL14 and is the answer not in the manual?
Questions and answers