Download Print this page
Adrian Steel VP1 Assembly And Installation Instructions Manual

Adrian Steel VP1 Assembly And Installation Instructions Manual

Perimieter ladder rack for full size vans

Advertisement

Quick Links

VP1
ASSEMBLY / INSTALL INSTRUCTIONS
1
Introduction / Comments:
VP1 PERIMIETER LADDER RACK FOR FULL SIZE VANS
Note:
It is advised that all fasteners used in this assembly and installation should be
checked for tightness at the following intervals: @ 2-weeks and again @ 6-
weeks of operation. This preventive maintenance step must be completed to en-
sure your Product gives you long service life.
VP1
PERIMETER LADDER RACK FSV
ADRIAN STEEL COMPANY WWW.ADRIANSTEEL.COM 906 JAMES STREET ADRIAN, MI 49221 800-677-2726
53566
A
19475
Publication Number:
Revision Level:
ECN Release:

Advertisement

loading
Need help?

Need help?

Do you have a question about the VP1 and is the answer not in the manual?

Questions and answers

Summary of Contents for Adrian Steel VP1

  • Page 1 @ 2-weeks and again @ 6- weeks of operation. This preventive maintenance step must be completed to en- sure your Product gives you long service life. PERIMETER LADDER RACK FSV ADRIAN STEEL COMPANY WWW.ADRIANSTEEL.COM 906 JAMES STREET ADRIAN, MI 49221 800-677-2726 53566 19475 Publication Number:...
  • Page 2 MEASURING TAPE STOP AND/OR WRENCHES ADDITIONAL TOOLS MAY BE NEEDED FOR THIS INSTALLATION AND THEY WILL BE IDENTIFIED IN THE STEPS THAT FOLLOW. ADRIAN STEEL COMPANY WWW.ADRIANSTEEL.COM 906 JAMES STREET ADRIAN, MI 49221 800-677-2726 53566 19475 Publication Number: Revision Level:...
  • Page 3 A PLUSNUT (RIVNUT) SETTING TOOL IS REQUIRED FOR PLUSNUT (RIVNUT) INSTALLATION . PLUS NUT SETTING TOOL CAN BE ORDERED THROUGH ADRIAN STEEL, OR USE AN AIR POWERED PLUSNUT SETTING GUN. 1/4-20UNC Plusnut (FAS0052) Use 3/8” dia. drill w/stop FAS0080 SCREW, HXHD, 1/4-20UNCx2.00”, G8...
  • Page 4 ASSEMBLY / INSTALL INSTRUCTIONS Installation and/or Assembly Fasteners (BAG19455-0 ) ADRIAN STEEL COMPANY WWW.ADRIANSTEEL.COM 906 JAMES STREET ADRIAN, MI 49221 800-677-2726 53566 19475 Publication Number: Revision Level: ECN Release:...
  • Page 5 To Secure after rack is fully Position Flange on Outer Foot asm in Drip Rail Channel as shown at Right (Vehicle Specific) ADRIAN STEEL COMPANY WWW.ADRIANSTEEL.COM 906 JAMES STREET ADRIAN, MI 49221 800-677-2726 53566 19475 Publication Number: Revision Level:...
  • Page 6 Foot Clamp, VP1, FD/DG Qty = 6 (2) FAS0213 CARRIAGE BOLT 29119-0 (2) FAS0125 NYLOCK NUT Foot Clamp, VP1, CHV/GM Qty = 6 ADRIAN STEEL COMPANY WWW.ADRIANSTEEL.COM 906 JAMES STREET ADRIAN, MI 49221 800-677-2726 53566 19475 Publication Number: Revision Level: ECN Release:...
  • Page 7 Apply Silicon sealant around Cross Tube Joints to prevent water seepage into the Rack Tubes. Silicone Sealant 26618-0 (8) places Cross Tube 57” 19747-0 FAS0581 Set Screw (8) Places ADRIAN STEEL COMPANY WWW.ADRIANSTEEL.COM 906 JAMES STREET ADRIAN, MI 49221 800-677-2726 53566 19475 Publication Number: Revision Level: ECN Release:...
  • Page 8 ASSEMBLY / INSTALL INSTRUCTIONS Step 12 Attach the Ladder Stops to the appropriate Crossbars according to end user lad- der that will be stowed on the completed VP1 Perimeter Ladder Rack. 19749-0 Ladder Stop (2) FAS0327 U-Bolt (4) FAS0124 Flat Washer...