Site Preparation
Opening Dimensions
DUAL STANDARD | FLUSH INSTALLATION
H
OPENING
HEIGHT
SIDE VIEW
1
NOTE: 3
/
"
finished returns will be visible and should be finished to match cabinetry.
(89)
2
DUAL STANDARD OPENING
Two 36" Models
71 1/2"
For standard installations, the face frame will extend 2"
beyond cabinetry. A dual installation kit is required for this
installation.
D
OPENING
DEPTH
W
H
83 3/4"
24"
(1816)
(2127)
(610)
TOP VIEW
W
OPENING WIDTH
FRONT VIEW
D
DUAL FLUSH OPENING
Two 36" Models
For flush installations, the face frame will be flush with sur-
(51)
rounding cabinetry. A dual installation kit is required for this
installation.
3
/
"
4
(19)
TYPICAL
1
3
/
"
2
(89)
FINISHED
RETURN
W
FRAMELESS
CABINETRY
3
/
"
4
(19)
TYPICAL
1
3
/
"
2
(89)
FINISHED
FILLER
RETURN
W
FRAMED
CABINETRY
W
H
72"
84 1/8"
26"
(1829)
(2137)
subzero.com | 5
D
(660)
Need help?
Do you have a question about the PRO Series and is the answer not in the manual?