Use these instructions to ensure correct installation and function of product. Dometic, LLC reserves the right to modify appearances and specifications without notice. TABLE OF CONTENTS INTRODUCTION ..................................2 DOCUMENT SYMBOLS ................................2...
IMPORTANT SAFETY INSTRUCTIONS This manual has safety information and instructions to help T he installation MUST comply with all ap- users eliminate or reduce the risk of accidents and injuries. plicable local or national codes, including the latest edition of the following standards: Recognize Safety Information U.S.A.
SPECIFICATIONS Door Clearance Hardware Dimensions Minimum distances between awning rail and entry FIG. 2 door: 9001011.(XXX)(#) 9001012.(XXX)(#) 3/8″ 1″ 12″ 7″ Wiring W hen entry door is toward center of awning, 34″ Harness add 2″ to minimum distances. Hole 40″...
PROCEDURE 2. Clip door edge guard onto upper corner of inner 3. Secure RH front channel to RH top casting using screen door (opposite to hinge). See (FIG. 4). 1/4-20 X 3/4″ hex head screw and 1/4″ split lock washer. See (FIG. 5). FIG.
ON. Disconnect the positive (+) 12 Vdc See instructions included with your terminal from supply battery. Otherwise, damage to Dometic, LLC ignition interlock kit for unit could occur. additional wiring instructions. 1. I nstall (fixed/wired) remote awning switch.
PROCEDURE Hang And Stabilize Back Channels FIG. 8 Fabric Roller Tube Assembly Failure to obey the following warn- Awning ings could result in death or serious injury: Rail ● IMPACT OR CRUSH HAZARD. This product should be installed in a controlled environment (inside).
Page 8
PROCEDURE 2. Place LH back channel directly under and per- 7. Place RH back channel directly under and per- pendicular to awning rail, and mark top mount- pendicular to awning rail, and mark top wiring ing hole locations. See (FIG. 2) & (FIG. 10). hole (if applicable) and top mounting hole loca- tions.
PROCEDURE 14. Carefully swing RH arm assembly aside (out of 19. Square LH back channel to RV and FRTA, the way), to expose marked hole locations. See and mark bottom mounting hole locations. See (FIG. 13). (FIG. 2) & (FIG. 12). ...
PROCEDURE Complete Back Channel Installation Secure Awning Fabric To Awning Rail 1. W ith power applied to awning, close awning (ful- 1. O pen and close awning four or five times to al- ly retract) to verify hardware is nesting correctly. low natural self adjustment of awning fabric.