8.0 Installation
8.8
Making The Electrical Connections
WARNING: This appliance must be earthed
1. The electrical connections are on the right hand side
of the unit.
2. Undo the two screws securing the cable clamp and
place to one side (Fig. 31).
3. Route the incoming electrical cable/s through the
grommet in the support bracket. This will prevent
damage to the cable.
4. Lay the cable through the cable clamp to gauge the
length of cable required when it is connected to the 4-
way terminal block.
5. Connect the (S/L), (N) and (
4-way terminal block (Fig. 33) and refit the cable clamp
(Fig. 31).
6. Check the electrical installation for;
earth continuity, short circuits, resistance to earth,
correct polarity and fuse failure.
) wires to the