Moving by Hand
WARNING!
No adjustments or maintenance
to be carried out unless:
♦ ♦ ♦ ♦ ♦
the engine stopped
♦ ♦ ♦ ♦ ♦
the ignition key removed
♦ ♦ ♦ ♦ ♦
the parking brake activated
When pushing or pulling the mower, be sure to engage
the IZT (Integrated Zeroturn Transaxle) bypass
linkages. The IZT bypass linkages are located on the
rear of the frame, below the rear engine guard.
•
Always turn off engine before engaging or
disengaging the hydro release. Never
attempt to adjust the bypass linkages with the
engine running.
•
Raise the deck into the highest cutting
position.
•
Pull the IZT bypass linkages out and into the
slots and release so that it is held in the
bypass position.
•
To reengage the IZT's to drive, reverse the
above procedure.
36
-
English
OPERATION
1. IZT Bypass linkage
Bypass linkages
1. Head outside of rear deck
1. IZT Bypass linkage
Bypass linkages
CZ10-2
1
2
CZ12