Putting The Engine Into Operation After Extended Out-Of-Service Periods (>3 Months) - MTU 20V4000L32FNER Operating Instructions Manual

Table of Contents

Advertisement

4.2 Putting the engine into operation after extended out-of-service
periods (>3 months)
Preconditions
☑ Engine is stopped and starting disabled.
☑ MTU Fluids and Lubricants Specifications (A001061/..) are available.
Putting the PowerPack into operation after extended out-of-service-periods
(>3 months)
Item
Engine
Engine
Valve gear
Lube oil system
Coolant circuit
Coolant circuit
Engine cabling
Gas supply
Engine management system Check for fault messages.
Battery
Action
Depreserve (→ MTU Preservation and Represervation Specifications
A001070/..).
Bar engine manually (→ Page 163).
Standstill ≥ 6 months: Lubricate valve gear (→ Page 180).
Check engine oil level (→ Page 188);
Check oil level in oil storage tank (→ Page 188).
Standstill > 1 year: Change engine coolant (→ Page 193);
Change mixture coolant (→ Page 200).
Check engine coolant level (→ Page 192);
Check mixture coolant level (→ Page 198).
Check plug connections (→ Page 203).
Open gas shut-off valve.
Check, fill acid/alkaline solution (see manufacturer's documentation).
MS150122/02E 2017-09 | Operation | 41

Advertisement

Table of Contents
loading

Table of Contents