7.4 Tools

The following tools will be required to install PS2900H-M and PS2900H-S.
Screw Driver
Safety Gloves
Electric Drill

7.5 Installation Steps PS2900H-S

Step 1: Install a PS2900H-S with four footstand (Item E) and place it on the ground and adjust it to the
level. After installing the footstand, use a track level bar to confirm the level. Insert the waterproof cover
(Item K) into the bottom of the battery and lock it in place with the clip.
Crimping Modular
Safety Goggles
Track Level Bar
8
Safety Shoes
Plier
Tape
Multimeter
Ribbon
Marker