Delay Start Function; Cancelling And Resetting The Programme; Cleaning And Routine Maintenance; Cleaning The Dryer - Candy GCV 580C Manual

Table of Contents

Advertisement

Delay Start Function

The Delay Start Function
When the function is first selected the display will show a delay of 3 hours, subsequent presses of
the button will increase the delay to 6 or 9 hours.
To commence the programme press
end of this time. The 3, 6 or 9 hour indicator light will flash to indicate that the start delay is in
progress.

Cancelling and Resetting the Programme

To cancel a programme press the button
it has been reset.

CLEANING AND ROUTINE MAINTENANCE

Cleaning the Dryer

● Clean the filter after every drying cycle.
.
After each period of use, wipe the inside of
the drum and leave the door open for a while to
allow circulation of air to dry it.
● Wipe the outside of the machine and the
door with a soft cloth.
DO NOT use abrasive pads or cleaning
agents.
● To prevent the door sticking or the build up of
fluff, clean the inner door and gasket with a
damp cloth after every drying cycle.
WARNING! The Drum, door and load may
be very hot.
allows the user to delay the start of the drying cycle by 3, 6 or 9 hours.
and the appliance will complete the drying cycle at the
for 3 seconds. The DRY light will flash to indicate that
OPERATION

Technical Specifications

Drum capacity
Maximum load
Height
Width
Depth
Energy Label Band
Information for Test Laboratory
EN 61121 Programme Programme To Use
-DRY COTTON
-IRON DRY COTTON
-EASY-CARE TEXTILE
IMPORTANT Always switch off and
remove the plug from the electricity supply
before cleaning this appliance.
For electrical data refer to the rating label
on the front of the dryer cabinet (with the door
open).
115 litres
7-8 kg
85 cm
60 cm
60 cm
C
-CUPBOARD DRY
-IRON DRY
-CUPBOARD DRY +
SYNTHETIC
EN 11

Advertisement

Table of Contents
loading

This manual is also suitable for:

Gcv 570c

Table of Contents