Direct Draw Draft Arm Installation - True TBB-2G-HD-LD Installation Manual

Table of Contents

Advertisement

TRUE
underbar refrigeration

DIRECT DRAW DRAFT ARM INSTALLATION

On direct draws, the drain is located at the front of the cabinet. To
plumb in the drain, connect 3⁄4" (2cm) P.V.C. pipe to the 3⁄4" (2cm)
barbed fitting supplies with the unit.
CO2 PRESSURE
Mobile tapsters, to retain complete mobility, the CO2 tank (up to
five pounds in size) can be placed inside the cooler (strap holders
furnished).
CAUTION
Filled CO2 tanks are potentially dangerous because of the pressure
they contain. If you are unfamiliar with their use or the use of the
CO2 regulator, seek information from your local distributor, or your
local beverage man before proceeding.
1
Draft arm install contents.
Draft arm not shown.
6
Thread beer draft arm
handle onto the draft arm.
2
Beer line connector.
7
8
INSTALL DRAFT ARM
Place rubber washer over draft arm mounting holes in cabinet, put
beer line connector down through hole. Next, secure draft arm with
four screws. (See images 1-6)
Insert air hose (one inch plastic tube) in draft arm, being careful not
to disturb insulation. Remove top cover of draft arm and attach air
hose clip to the insulating sleeve at the top of the draft arm. Replace
top cover. The air hose clip will assure that the hose remains in proper
place at all times, keeping the beer faucet cold. (See image 7-9)
3
Thread beer line connector to draft arm and secure draft arm to cabinet
with rubber gasket under the draft arm.
9
.
www
truemfg
4
5
.
com
8

Advertisement

Table of Contents
loading

Table of Contents