Advertisement

TABLE OF CONTENTS:
1.00
BEAMS & CONNECTORS:
1.10
Plan View Resultant Beam Direction
1.11
Beam 1-12 (Top Row 1) and Beam 25-36 (Third Row 3)
1.12
Beam 13-24 (Second Row 2) and Beam 37-48 (Bottom Row 4)
1.20
Rear View Connector Layout
1.30
Connector Port Table (From Rear View)
2.00
BEAM PATTERN
2.10
Vertical Beam Pattern
2.20
Horizontal Beam Pattern (Row 1 & 3)
2.30
Horizontal Beam Pattern (Row 2 & 4)
3.00
TRANSPORTATION / INSTALLATION
3.10
Transportation (From Point to Point)
3.20
Bracket Mounting
3.30
Installation using a crane
3.31
Lifting the Antenna
3.40
Antenna Installation
3.41
Antenna Leveling
3.42
Digital Level Gauge Calibration
3.43
Adjustment Requirement
Revision History:
Date
email:
info@matsing.com
MS-48F90
Date
Prepared by
19 Nov 2021
Ray Ling
INSTRUCTION MANUAL MS-48F90
Description
website:
Instruction Manual
Approved by
Pavel
www.matsing.com
Document nos
MS-48F90-IM-001
Revised by
Rev nos
Page
Revision
0
1
/
8

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the MS-48F90 and is the answer not in the manual?

Questions and answers

Summary of Contents for Matsing MS-48F90

  • Page 1 Approved by Document nos Revision 19 Nov 2021 Ray Ling Pavel MS-48F90-IM-001 INSTRUCTION MANUAL MS-48F90 TABLE OF CONTENTS: 1.00 BEAMS & CONNECTORS: 1.10 Plan View Resultant Beam Direction 1.11 Beam 1-12 (Top Row 1) and Beam 25-36 (Third Row 3) 1.12...
  • Page 2 1.00 BEAMS & CONNECTORS: 1.10 Plan View Resultant Beam Direction 1.11 Beam 1-12 (Top Row 1) and Beam 25-36 (Third Row 3) ˚ BEAM 1 - 12 BEAM 25 - 36 (Top Row 1) (Third Row 3) Plan View Resultant Beam Directions Frequency: 3300 –...
  • Page 3 1.20 Rear View Connector Layout Page...
  • Page 4 1.30 Connector Port Table (From Rear View) 1.31 Beam 37-48 BEAM BEAM BEAM BEAM BEAM BEAM BEAM BEAM BEAM BEAM BEAM BEAM PORT PORT PORT PORT PORT PORT PORT PORT PORT PORT PORT PORT (+ 5˚) (+ 5˚) (+ 5˚) (+ 5˚) (+ 5˚) (+ 5˚)
  • Page 5 2.00 BEAM PATTERN 2.10 Vertical Beam Pattern 2.20 Horizontal Beam Pattern (Row 1 & 3) 2.30 Horizontal Beam Pattern (Row 2 & 4)
  • Page 6: Transportation / Installation

    3.00 TRANSPORTATION / INSTALLATION 3.10 Transportation (From Point to Point) Strictly comply to the Local authority and regulatory on Workplace Safety and Health Control and Measure when moving and transportation of large or heavy equipment, appropriate material handling machine should be use. (Risk Assessment apply for Forklift or Pallet Truck Lifting) 3.20 Bracket Mounting...
  • Page 7 3.30 Installation using a crane Strictly comply to the local authority and regulatory on Workplace Safety and Health Control and Measure when performing lifting of large or heavy equipment, appropriate material handling machine should be used and only certified personnel should perform the task. (Risk Assessment requirement applies for both Up-Lifting and Down-Lifting.) 3.31 Lifting the Antenna...
  • Page 8: Antenna Installation

    3.40 Antenna Installation With reference to "Bracket Mounting Procedure", End user is required to Custom-Make the additional supporting bracket and tighten it to the existing Antenna bracket to meet the deployment needs. 3.41 Antenna Leveling After the Antenna is mounted to the bracket, it is required to be adjusted to 0˚ (Zero Degree) with ≤0.2˚...

Table of Contents