Matsing MS-24C180 Instruction Manual
Hide thumbs Also See for MS-24C180:

Advertisement

Quick Links

TABLE OF CONTENTS:
1.00
BEAMS & CONNECTORS:
1.10
1.20
1.30
2.00
2.10
2.20
3.00
4.00
4.10
4.20
4.30
4.31
4.40
4.41
4.42
4.43
Revision History:
Date
email:
info@matsing.com
MS-24C180
Date
Prepared by
5 Feb 2024
Ray Ling
INSTRUCTION MANUAL MS-24C180
Description
website:
Instruction Manual
Approved by
Pavel
www.matsing.com
Document nos
MS-24C180-IM-001
Revision
Revised by
nos.
Page
Revision
0
1
/
8

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the MS-24C180 and is the answer not in the manual?

Questions and answers

Summary of Contents for Matsing MS-24C180

  • Page 1 Date Prepared by Approved by Document nos Revision 5 Feb 2024 Ray Ling Pavel MS-24C180-IM-001 INSTRUCTION MANUAL MS-24C180 TABLE OF CONTENTS: 1.00 BEAMS & CONNECTORS: 1.10 Plan View Resultant Beam Direction 1.20 Plan View Connector Layout 1.30 Connector Port Table 2.00...
  • Page 2 1.00 BEAMS & CONNECTORS: 1.10 Plan View Resultant Beam Direction Plan View Resultant Beam Directions Frequency:m 3700 - 4200 MHz Page...
  • Page 3 1.20 Plan View Connector Layout 1.30 Connector Port Table Page...
  • Page 4 2.00 BEAM PATTERN 2.10 Horizontal Beam Pattern 3700 - 4200 MHz Frequency: 2.20 Vertical Beam Pattern Frequency: 3700 - 4200 MHz Page...
  • Page 5 3.00 RET REPLACEMENT / INSTALLATION PROCESS Step 3: Install the Hex Step 1: Uninstall the shaft Step 2: Uninstall the shaft adaptor and screw it on stopper Handle Step 5: RET Actuator stub Step 4: Install the RET Step 6: RET Tighten to gap facing out attachment interface attachment interface...
  • Page 6 4.00 TRANSPORTATION / INSTALLATION 4.10 Transportation (From Point to Point) Strictly comply to the Local authority and regulatory on Workplace Safety and Health Control and Measure when moving and transportation of large or heavy equipment, appropriate material handling machine should be use. (Risk Assessment apply for Forklift or Pallet Truck Lifting) 4.20 Bracket Mounting...
  • Page 7 4.30 Installation using a crane Strictly comply to the local authority and regulatory on Workplace Safety and Health Control and Measure when performing lifting of large or heavy equipment, appropriate material handling machine should be used and only certified personnel should perform the task. (Risk Assessment requirement applies for both Up-Lifting and Down-Lifting.) 4.31 Lifting the Antenna...
  • Page 8 4.40 Antenna Installation With reference to "Bracket Mounting" Procedure, End user is required to Custom-Make the additional supporting bracket and tighten it to the existing Antenna bracket to meet the deployment needs. 4.41 Antenna Levelling After the Antenna is mounted to the bracket, it is required to be adjusted to 0˚ (Zero Degree) with ≤0.2˚...

Table of Contents