Approved by Document nos Revision 21 Jun 2023 Ray Ling Pavel MS-48C90-IM-001 INSTRUCTION MANUAL MS-48C90 TABLE OF CONTENTS: 1.00 BEAMS & CONNECTORS: 1.10 Plan View Resultant Beam Direction 1.11 Beam 1-12 (Top Row 1) and Beam 25-36 (Third Row 3) 1.12...
Page 4
1.30 Connector Port Table (From Rear View) 1.31 Beam 37-48 BEAM BEAM BEAM BEAM BEAM BEAM BEAM BEAM BEAM BEAM BEAM BEAM PORT PORT PORT PORT PORT PORT PORT PORT PORT PORT PORT PORT (+ 5˚) (+ 5˚) (+ 5˚) (+ 5˚) (+ 5˚) (+ 5˚) (+ 5˚) (+ 5˚) (+ 5˚) (+ 5˚) (+ 5˚) (+ 5˚)
Page 6
3.00 TRANSPORTATION / INSTALLATION 3.10 Transportation (From Point to Point) Strictly comply to the Local authority and regulatory on Workplace Safety and Health Control and Measure when moving and transportation of large or heavy equipment, appropriate material handling machine should be use. (Risk Assessment apply for Forklift or Pallet Truck Lifting) 3.20 Bracket Mounting...
Page 7
3.30 Installation using a crane Strictly comply to the local authority and regulatory on Workplace Safety and Health Control and Measure when performing lifting of large or heavy equipment, appropriate material handling machine should be used and only certified personnel should perform the task. (Risk Assessment requirement applies for both Up-Lifting and Down-Lifting.) 3.31 Lifting the Antenna...
Page 8
3.40 Antenna Installation With reference to "Bracket Mounting Procedure", End user is required to Custom-Make the additional supporting bracket and tighten it to the existing Antenna bracket to meet the deployment needs. 3.41 Antenna Leveling After the Antenna is mounted to the bracket, it is required to be adjusted to 0˚ (Zero Degree) with ≤0.2˚...
Need help?
Do you have a question about the MS-48C90 and is the answer not in the manual?
Questions and answers