Preparing for Installation
• Use the correct external power source. Operate the product only from the type of power source indicated
• To help prevent electrical shock, plug all the power cables into properly grounded electrical outlets.
• Observe power strip ratings. Make sure that the total current rating of all products that are plugged into
• Do not modify power cables or plugs yourself. Consult with a licensed electrician or your power company

Verifying Switch Operation

Before you install the switch in a rack or on a table or shelf, power on the switch and verify that it passes
POST.
To power on the switch, plug one end of the AC power cord into the switch AC power connector, and plug
the other end into an AC power outlet.
As the switch powers on, it begins the POST, a series of tests that runs automatically to ensure that the switch
functions properly. LEDs can blink during the test. POST lasts approximately 1 minute. The SYST LED
blinks green, and the other LEDs remain solid green.
When the switch completes POST successfully, the SYST LED remains green. The LEDs turn off and then
reflect the switch operating status. If a switch fails POST, the SYST LED turns amber.
POST failures are usually fatal. Call Cisco technical support representative if your switch fails POST.
After a successful POST, unplug the power cord from the switch and install the switch in a rack, on a table,
or on a shelf.
on the electrical ratings label. If you are not sure of the type of power source required, consult a local
electrician.
These power cables are equipped with three-prong plugs to ensure proper grounding. Do not use adapter
plugs or remove the grounding prong from a power cable.
the power strip does not exceed 80 percent of the power strip rating.
for site modifications. Always follow your local and national wiring codes.
Cisco Catalyst 9200CX Compact Series Switches Hardware Installation Guide
Verifying Switch Operation
19

Advertisement

Table of Contents
loading

This manual is also suitable for:

Catalyst 9200cx compact seriesC9200cx-8p-2x2gC9200cx-12p-2x2gC9200cx-12t-2x2gCatalyst c9200cx seriesCatalyst c9200cx ... Show all

Table of Contents