Please notify your supplier of any damage which might have occurred during transport. Please keep these instructions. Please also take note of the online product documentation provided General instructions of the Brunner products installation for the stove construction. (https://www.brunner.de/produktdownloads/kacheloefen-kamine/allge- meine-hinweise-fuer-den-aufbau_de.pdf) laden können.
Dimension sheets - BKH Tunnel 50-82 green Ø180/200 Ø125/150 1008 1073 … lifting door/tilting door with mounting frame and cast iron dome Stand: 2023-12-18...
Page 90
Dimension sheets - BKH Tunnel 50-82 green Ø180/200 Ø125/150 1008 1073 … lifting door/tilting door with door frame and cast iron dome Stand: 2023-12-18...
Page 91
Dimension sheets - BKH Tunnel 50-82 green Ø125/150 1008 1073 … lifting door/tilting door with mounting frame and MAS Stand: 2023-12-18...
Page 92
Dimension sheets - BKH Tunnel 50-82 green Ø125/150 1008 1073 … lifting door/tilting door with door frame and MAS Stand: 2023-12-18...
Page 93
Dimension sheets - BKH Tunnel 50-82 green Ø180/200 Ø125/150 1008 1073 … lifting door/tilting door with mounting frame and cast iron heat exchanger rings + dome Stand: 2023-12-18...
Page 94
… lifting door/tilting door with door frame and cast iron heat exchanger rings + dome We suggest for CAD planning Palette CAD. Permanent updated drawings: www.brunner.de Frames/ flue gas outlet connection/ combustion air supply connection/ front variants/ support bearing are marked in col-...
Page 95
Planning and installation - BKH Tunnel 50-82 green Tested according to EN 13229 W EN 13229 WA Values measured at Rated power Storage operation Data for functional demonstration Rated heat power Fire wood volume kg/h Combustion performance 12.0 Flue gas mass flow 12.0 Flue gas temperature after: Cast iron dome...